De-characterization Program
Vale completes de-characterization of upstream dam Dike 2 of the Pontal System, in Itabira (MG)
This month, Vale completed the de-characterization of another structure built using the upstream method, Dike 2 of the Pontal System, located at the Cauê Mine in Itabira (MG). This is the 13th structure of this type to be eliminated by Vale in Brazil since 2019, and the sixth to be de-characterized in the municipality. With this, the company has completed more than 40% of the 30 structures to be eliminated in the de-characterization program, as they were built using the same method as the Brumadinho dam.
Dike 2 has not received any tailings since 2019, and the de-characterization work generated approximately 200 jobs, both direct and outsourced, with priority given to hiring local workers.
Dike 2 was the sixth upstream structure to be removed in Itabira, out of a total of ten dams included in the de-characterization program. In September 2022, the Ipoema dam at Mina do Meio and Dike 3, also in the Pontal system, had already been removed. Previously, dams 4 and 5 of the Pontal system and the Rio do Peixe dam were de-characterized.
Furthermore, to increase safety and reduce the impact in case of an emergency, a downstream containment structure (ECJ) was built as a precautionary measure for the works to eliminate the Minervino and Cordão Nova Vista dams at the Pontal dam. The Coqueirinho ECJ, as it is called, like the others built by Vale, complies with the regulations of the National Mining Agency (ANM) regarding the adoption of measures to increase safety during the de-characterization phase.
B3/B4 dam in Nova Lima (MG) had its emergency level reduced again
The B3/B4 dam, located at the Mar Azul mine in Nova Lima (MG), had its emergency level reduced from 2 to 1 by the National Mining Agency this Monday night (9/10). The progress of the de-characterization process, with the removal of approximately 85% of the reservoir's contents, led to an improvement in the dam's stability conditions and made it possible to reduce the emergency level, as required by current legislation.
Despite the improvement in the dam's stability conditions, in a joint decision with the Municipal and State Civil Defense, and in compliance with the regulations of the National Mining Agency (ANM), the structure's self-rescue zone (ZAS), now at Emergency Level 1, must remain evacuated as a preventive and safety measure. As such, there will be no return of families or release of access at this time.
The B3/B4 dam is one of 18 upstream dams still to be eliminated by Vale and is part of the company's de-characterization program. As of 2019, 12 of the 30 planned structures have already been eliminated (nine in Minas Gerais and three in Pará), representing 40% of the total. The Company expects to complete the elimination of the 13th structure this month.
Click here to read the full press release (available only in Portuguese).
Our Strategy and Commitments
Statement on PT Vale Indonesia Tbk
Vale's Base Metals business holds 43.34% of PT Vale Indonesia Tbk (‘PTVI’ or ‘the Company’), making Vale SA an indirect shareholder through its Base Metals ownership. Our operational focus centers in Sorowako, South Sulawesi, consisting of mining, smelting, and refining activities. PTVI's growth projects align with Indonesia's ambition to become a global electric vehicle hub, with ongoing initiatives in Central, South, and Southeast Sulawesi. PTVI is listed on the Indonesia Stock Exchange. Learn more at www.vale.com/indonesia.
This statement provides clarification of some key socio and environmental topics related to our activities in the region.
PTVI has pursued sustainable nickel mining and processing excellence since its establishment in 1968 and remains committed to ethical practices and ESG principles. Our interactions with local communities are rooted in dialogue and mutual agreement, ensuring just compensation in line with legal norms. PTVI undertakes a formal grievance process upon receipt of any stakeholder complaint. We actively address unauthorized encroachments within our concession area and collaborate with relevant authorities to ensure compliance. Any activities related to relocation and compensation adhere to the International Finance Corporation's Performance Standards on Environmental and Social Sustainability and other internationally recognized best practice frameworks. Farmers, for instance, who have been subject to involuntary displacement have been duly compensated.
Respecting Human Rights is a paramount concern for PTVI. Our Code of Conduct (CoC) and Human Rights Policy are aligned with international standards, including the Universal Declaration of Human Rights, the UN Guiding Principles on Business and Human Rights, and the Voluntary Principles on Security and Human Rights. We emphasize open dialogue with local communities and authorities to resolve conflicts. Our commitment to Human Rights training for all security personnel, as outlined in our CoC, underscores this commitment. Reports of threats or harassment are treated seriously and reported to authorities as per national legislation. In compliance with Indonesian laws and regulations, PTVI reports acts of violence and disruption of mining activities through non-peaceful demonstrations, such as a recent occurrence near the Asuli and Lembo South area in 2023.
PTVI is also dedicated to enhancing the well-being of the communities where it operates and remains committed to mitigating any risk and impact of its mining activity on the area's water quality. The local community in Asuli village historically faced limited access to water sources and relied on water storage ponds for their water supply. Prior to commencing mining activities, PTVI conducted a comprehensive hydrological analysis to minimize potential impacts on existing water sources and storage ponds. This analysis revealed that the pre-existing water storage ponds already suffered from issues of being brown and muddy with limited water volume, confirming that the poor quality of the spring water existed prior to PTVI initiating mining operations in the area. Additionally, the Lembo South block featured unauthorized pepper plantations within a protected forestry area established by local communities alongside mining activities. Based on PTVI's hydrological analysis, there is no evidence of adverse effects on water storage ponds resulting from mining activities. Despite the limited extent of our mining operations in the Lembo South Block and the absence of any negative impact on the local communities' water storage ponds, PTVI has taken proactive steps in constructing multiple water tank facilities to cater to the needs of neighboring communities, especially the Asuli village.
Moreover, PTVI has consistently upheld an exceptional water quality record. We have been and remain fully committed to ensuring the availability of clean and safe water. Within Sorowako, PTVI effectively manages over 120 wastewater treatment facilities spanning more than 250 hectares to ensure that water discharge aligns with mandated standards. Rigorous effluent sampling and testing take place on a daily basis. Collaboration with accredited independent laboratories for the collection and processing of effluents, in conjunction with regular governmental oversight and assessments, underscores our commitment to compliance. This commitment extends beyond legal requirements, exemplified by PTVI's track record of surpassing prevailing laws and regulations. PTVI is dedicated to addressing concerns related to hexavalent chromium (Cr6+) within our operations. The 2022 PTVI Sustainability Report highlights our meticulous monitoring and sampling efforts, consistently demonstrating that Cr6+ levels in effluents remain well below permissible limits.
In Sorowako, including the Asuli village, our efforts in this regard have encompassed other various initiatives as well. To facilitate easier access to safe and clean water, PTVI has implemented the provision of water tanks, bolstering local communities' water supply infrastructure. Our approach is comprehensive, incorporating hydrological analysis, the establishment of clean water sources through water tanks and borehole wells within the existing network, the identification of springs, and the installation of necessary equipment. The hydrological analysis conducted underscores that our mining activities do not have a detrimental impact on the water supply. Our engagement with communities, in tandem with our collaboration with local authorities, is well-documented. Notably, since July 2023, the community has taken charge of a self-managed water system initiated and furnished by PTVI. Through active participation, the community maintains operation and upkeep of this system, ensuring the sustained availability of clean water.
PTVI refrains from making comments on the discretionary actions of the Police and regulatory bodies and affirms our commitment to legal adherence and ethical conduct, reporting instances of violence and vandalism involving PTVI's employees, contractors, and assets in accordance with its commitment to provide a safe and healthy workplace. . Our approach to conflict resolution prioritizes open dialogue involving the community, village, sub-district, district governments, and other stakeholders. These engagements are carried out with strict observance of the existing legal framework. PTVI’s dedication to the well-being of the community is reflected in our Code of Conduct (CoC) and Human Rights Policy. In line with these commitments, all PTVI security personnel, including contractors, have undergone human rights training.
During a protest in 2023, PTVI found that the protest escalated into vandalism. To avoid potential further escalations or a hostile situation developing, PTVI reported the situation to the authorities, deferring the enforcement to them, as per applicable law. While PTVI cannot comment on police discretion, PTVI's commitment to dialogue is unwavering whilst upholding our obligation to report incidents and prioritize peaceful resolution, fostering a safe and inclusive environment. Our commitment to community safety and respecting and promoting Human Rights is again prescribed in our CoC and Human Rights Policy.
Engagement through open dialogue is a cornerstone of PTVI's approach, and we actively prioritize interactions with the local community, village leadership, sub-district and district governments, as well as other relevant stakeholders. It is crucial to note that PTVI's influence does not extend to military actions. We respect military jurisdiction and are committed to safeguarding and upholding human rights within our operations. Inquiries or concerns pertaining to military conduct should be directed to the appropriate governing bodies in Indonesia.
PTVI reaffirms our commitment to open dialogue with civil society, to promotion of community welfare, and to abiding by the highest ESG standards.
Control and Management of Dams
Vale implements GISTM at its tailing’s storage facilities
Fulfilling the commitment assumed with the ICMM, with society and its employees, Vale has implemented GISTM in 48 of its 50 tailings storage facilities (TSFs), 35 of which are in the Ferrous business unit in Brazil and 13 in the Base Metals business unit (11 in Canada and 2 in Brazil). The two remaining Ferrous TSFs in Brazil have a lower consequence classification and it will comply with the standard by August 2025, following the criteria of the Conformance Protocols defined by ICMM. The 48 compliant TSFs meet the GISTM requirements, and some of them have action plans in place according to the Conformance Protocols.
To access the complete Press Release, click here.
More information about the Vale’s dams is available at www.vale.com/web/esg/.
Control and Management of Dams
Vale informs that it has been denied DCOs of the PAEBMS for 4 of its structures
Vale informs that the Declarations of Conformity and Operability ("DCO") of the Emergency Action Plans for Mining Dams ("PAEBM") have been denied for four of its structures, namely Monjolo, ED Monjolo, Porteirinha (Piracicaba River, MG) and Dam 7 (Jeceaba, MG), in accordance with Resolution No. 95/2022 of the National Mining Agency (ANM). The DCO became mandatory in 2022 and specifically evaluates the PAEBM and related measures. The denial signals that there are actions to be taken by Vale to ensure that the referenced PAEBMs have adequate operating conditions. The company is acting to resolve the identified discrepancies as soon as possible.
Vale reiterates that the stability conditions of the four structures remain unchanged. Of the four structures, only Dam 7 was in operation for tailings disposal at the time of the assessment. Based on the negative DCO and prioritizing the best safety conditions for its employees and communities, Vale has suspended the operation of Dam 7 and related production processes until the actions related to the corresponding PAEBM are implemented.
Mr. Manuel Lino Silva de Sousa Oliveira was appointed today as Lead Independent Director of Vale's Board of Directors
Vale S.A. informs that Mr. Manuel Lino Silva de Sousa Oliveira was appointed today as Lead Independent Director of Vale's Board of Directors. Mr. Ollie Oliveira has been an independent member of the Company's board since 2021, with recognized performance on several international boards in the industrial area and with more than 35 years of experience in corporate finance and strategy, mainly in the mining sector.
To access the complete Press Release, click here.
And for more information, access the Board of Directors and Leadership.
Ethics and Transparency
Vale released 2022 Tax Transparency Report
Vale released yesterday its Tax Transparency Report 2022, which details the taxes and royalties paid in Brazil, where most of our operations are located, and those paid globally to all spheres of government and by project.
We highlight the jurisdictions where we have our mining operations, since our tax contribution plays a fundamental role in supporting the communities, people and governments of the regions where we operate.
In 2022, Vale paid US$ 9.6 billion in taxes and royalties, of which US$ 8.7 billion (90%) were paid in Brazil.
Click here to access the full report.
And for additional information, please visit Ethics, Compliance and Tax Transparency.
The dams Área IX and Capitão do Mato are out of emergency situation and have their safety and stability certified
Control and Management of Dams
Control and Management of Dams
Ethics and Transparency
Vale announces agreement with the United States Securities and Exchange Commission
Vale S.A. informs that it has entered into an agreement with the United States Securities and Exchange Commission (“SEC”). The agreement will terminate a lawsuit filed by the SEC against the Company in April 2022 and will be effective once ratified by the United States District Court for the Eastern District of New York. Under the agreement, without admitting or denying the settled claims, Vale will make payments totaling US$ 55.9 million to the SEC. In addition, the SEC will not oppose Vale’s motion to dismiss all claims that the Company acted with fraudulent or reckless intent regarding its disclosures. Vale continues with its commitment to remediate and repair the damage caused by the dam collapse in Brumadinho in 2019.
Click here to access the Press Release.
Ethics and Transparency
Vale releases its Ethics & Compliance Annual Report
Vale's Ethics & Compliance Program is completing two years. In line with our commitment to transparency, we are releasing the second edition of our Ethics & Compliance Annual Report, which gathers information from 2022.
In addition to Whistleblower Channel and Consequence Management data, including the number of terminations of employment in 2022, the document highlights the implementation of our new channel for employees and contractors in Brazil to report sexual harassment or discrimination with specialized and empathetic support. Information about our communication and training actions carried out last year, such as Ethics Week, is also shared in this report.
Click here to access the report.
For more information about the Program, visit the Ethics & Compliance page.
Water
Vale will promote an event at the UN Water Conference. Participate!
From the 22nd to the 24th of March, Vale will participate in the UN Water Conference 2023 in New York.
The purpose of the conference is to review the implementation of the Decade Goals: Water for Sustainable Development.
In addition to being present at the conference, we will also promote a virtual Side Event: Challenges and opportunities for sustainable water management in the mining industry.
Our goal is to encourage discussion about the mining sector's relationship with water and present common challenges and best practices aiming at the rational and sustainable use of the resource.
Speakers
Bruno Ferraz (Environment Executive Manager | Vale)
Guilherme Alves (Environment Manager | Vale)
Renata Andries (Water Resources Specialist| Vale)
David Soares (Water Resources Specialist| Vale)
Felipe Tavares (Superintendent of Hydrological and Socioeconomic Studies | ANA | National Water Agency)
Cláudia Salles (Manager of Sustainability | IBRAM | Brazilian Mining Institute)
Valmir Pedrosa (Professor and Consultant | UFAL | Federal University of Alagoas)
Alice Castilho (Director of Territorial Management |CPRM | Geological Service of Brazil)
Luis Armacollo (Corporate Account Manager | CEBEDS representative | Brazilian Business Council for Sustainable Development)
Guilherme Freitas (Global Health, Safety and Environment Manager | NEXA)
PARTICIPATE AND HELP US SHARE THIS IDEA!
Date: March 22, 2023
Time: 1:00 pm (NY time | EDT)
To attend the event,
Policies and Corporate Documents
Vale informs the update of the Vale Group Business and Entity Management Policy and the disclosure of the new Authority Policy
Control and Management of Dams
B3/B4 dam is removed from critical safety condition
Control and Management of Dams
Sul Inferior has its emergency level 1 removed
Control and Management of Dams
Four Vale's dams in Minas Gerais have their emergency levels removed and receive a positive declaration of stability.
The B5/MAC (Nova Lima), Marés II (Belo Vale), Santana (Itabira), and Paracatu (Catas Altas) dams, all in Minas Gerais, had their emergency level removed and obtained a positive declaration of stability (DCE), attesting the safety of the structures.
De-characterization Program
Vale eliminates three more upstream structures and completes 40% of its Decharacterization Program
Capitão do Mato had its emergency level reduced
Integrated Report
Integrated Report
Vale publishes its Integrated Report 2021
Vale publishes its Integrated Report 2021
Control and Management of Dams
Vale updates on Stability Condition Declarations
In view of the biannual submission of Stability Condition Declarations (“DCEs”) to the National Mining Agency (“ANM”), on March 31, 2022, Vale informs that a dam (Porteirinha) has been added to the list of structures with negative DCE. Thus, there are currently 30 dams without DCE and with active emergency level protocols, reflecting the greater scrutiny and rigor adopted in the risk management program associated with dams, through continuous monitoring via EoR (Engineer of Record). Also in line with the evolution of governance and management processes, a review was made of the number of dams included in the National Dam Safety Policy (“PNSB”). The updates refer to the following structures:
-
Porteirinha Dam, located at the Água Limpa mine, in the municipality of Santa Bárbara/MG, intended for sediment containment, located at the Água Limpa mine, in the municipality of Santa Bárbara/MG, which had a negative DCE emission, within the process of continuous performance evaluation carried out by the respective EoR from the review of new information obtained with new drilling and testing data. In this sense, the level 1 emergency protocol was activated, according to the Emergency Action Plan for Mining Dams, without the need to evacuate the Self-Rescue Zone downstream of the structure and without material impact on the company's operations. It is a small-sized, conventional earth dam, with about 2.4 million cubic meters of accumulated sediment volume. Vale will establish complementary studies and implement additional security measures for the structure, in line with its conservative approach to risk management.
-
Pondes de Rejeitos, in the municipality of Parauapebas/PA, was permanently excluded from the PNSB due to its de-characterization.
-
Dique 02 and Dique 06, located in Barão de Cocais/MG and São Félix do Xingu/PA, previously reported within the scope of the PNSB, had this reporting removed due to a review of the regulatory understanding.
-
Bacia 05 Pé de Serra, Captação de Água, Lagoa Azul and Natividade, located in the municipalities of Corumbá/MS, Parauapebas/PA, Brumadinho/MG and Ouro Preto/MG, respectively, with previous reporting as mining structures included in the PNSB, were removed from such framework in the condition of structures for water catchment, non-related to the mining activity.
In this context, the total number of Vale's mining structures included in the PNSB decreases from 110 to 103. The company reiterates that its priorities are the safety of people and communities downstream of its operations and the safety of all its structures. For more information on the management and performance of Vale's dams, visit the pages dedicated to the themes on the company's ESG Portal.
Vale's Statement on the Bill 191/2020
Vale considers that the Bill 191/2020 does not meet the objective of regulating the constitutional provision that includes the possibility of economic activities, including mining, on indigenous lands in Brazil.
Vale's performance is guided by the respect for the rights of indigenous peoples and the company understands that mining on indigenous lands may only take place with the Free, Prior and Informed Consent (FPIC) of the indigenous themselves and in light of a regulatory framework that contemplates the participation and autonomy of indigenous peoples. The recognition of FPIC is essential to meet the rights of indigenous populations to determine their own development and the right to exercise self-determination in face of decisions that concern their territories.
Vale also reinforces that it does not have any mining rights nor does it carry out any research or mining activities on indigenous land in Brazil. Last year, the company announced the relinquishment of all its mining processes on indigenous lands in the country, which includes research and mining requirements. Withdrawal requests were filed with the National Mining Agency (ANM) throughout 2021.
Vale develops activities in traditional lands in countries where there are regulations in force, such as Voisey's Bay in Canada, always with strict observance of the principles mentioned above, with emphasis on Free, Prior and Informed Consent (FPIC), as legally applied in the jurisdictions in which Vale has mining activities
Control and Management of Dams
Vale informs on Dique de Pedra
Vale informs on Dique de Pedra
Due to the entry into force of Resolution 95/2022 of the National Mining Agency (ANM), which establishes new parameters for classifying emergency levels, Vale informs that today it has increased the emergency level of Dique de Pedra, Fábrica mine, in Ouro Preto (MG), to 2 from 1. Vale emphasizes that the safety conditions of the structure remain unchanged. There is no permanent occupation of the structure's Self-Rescue Zone, nor any impact on the company's operations.Dique de Pedra is an inactive tailings containment structure, built in a single stage, with a current volume of 500,000 cubic meters.
The structure was conceived as a temporary structure, associated with the Forquilha IV dam, but started to be treated as an independent dam in relation to the existing dam downstream after a precision topographic survey. Given the lack of geotechnical information about the structure and its conception as a temporary structure, a conservative scenario was preventively adopted in September 2021, with the activation of a level 1 emergency protocol and the adoption of additional studies by Vale since then, in addition to continuous monitoring.
Climate Change
Positioning on the Climate Corporate Responsibility Monitor report study
Vale thanks the New Climate Institute and Carbon Market Watch for publishing the Climate Corporate Responsibility Monitor report, which analyzes the climate change strategies of 25 large global corporations, and keeps the topic under discussion.
Vale believes, however, that, for a future edition of the study, the authors could complement their analyses with qualification of the sectoral challenges of which the companies evaluated are part. Mining and steel are admittedly hard-to-abate sectors, whose decarbonization trajectory is marked by a high degree of uncertainty in technological routes and high decarbonization costs.
Vale's decarbonization strategy is public and based on a global policy. Vale's annual climate change performance is evaluated by specialized institutions such as Sustainalytics, Climate Action 100+, RFC Ambrian, among others. The company even received an A-rating, above the average for the mining sector, in the assessment of CDP - an international non-profit organization that brings together 13,000 companies in 90 countries and represents more than 590 investors with assets from order of USD 110 trillion.
Vale has a historic commitment to fighting climate change and for almost 20 years has voluntarily published its emissions inventory and advances in the climate change agenda. In 2019, Vale updated its emission reduction commitments, based on the requirements of the Science Based Targets Initiative (SBTi), formally submitting them to the institution's validation. The company's net zero goal, which encompasses scopes 1 and 2, is technically in line with SBTi guidelines and only assumes emission reduction initiatives – it does not consider offsetting.
The company was one of the first to establish a quantitative scope 3 emission reduction target, also based on the SBTi requirements, with the only difference of allowing marginal use of offsets for the scope 3 target due to the high emission reduction challenge in steel customers.
Vale has robust internal governance that supports the cultural and technological transformation required for the decarbonization of mining and its value chain, notably the steel industry. Last year, the company launched a new product on the market, the green briquette, which has the potential to reduce emissions by up to 10% in steel mills. To date, Vale has entered into partnerships to develop decarbonization solutions with customers that represent approximately 30% of the world's steel production and about 40% of the company's scope 3 carbon emissions.
The use of Nature-Based Solutions to offset any possible residual emissions that cannot be abated through technological solutions is conditioned to advances in discussions on the implementation of a global carbon market, with predictable and reliable rules, based on discussions already started with the regulation of Article 6 of the Paris Agreement, during COP 26, in Glasgow. As explained at COP-26, however, Vale believes in the potential of Nature-Based Solutions to mitigate global warming. Currently, the company helps to protect almost 1 million hectares of forests in the world, an area 11 times larger than that occupied by its operations, thus contributing to the protection of native fauna and flora species, mainly endemic and threatened with extinction. In 2019, the company also announced a voluntary commitment to protect and restore an additional 500,000 hectares of forests by 2030. In two years, 6,000 hectares have already been recovered and partnerships have been signed to protect 115,000 hectares of forests in Brazil.
Vale's purpose is to improve life and transform the future. Together.
Control and Management of Dams
Elefante has its emercengy level 1 removed
Vale announces the sale of its coal assets Vale announces the sale of its coal assets
Control and Management of Dams
Marés I dam had its emergency level 1 removed
De-characterization plan
Vale concludes the elimination of the seventh upstream dam
Conclusion of the works on dike 5, in Itabira (MG), represents an advance in the company’s commitment to eliminate every upstream dams it has in the country.
The decharacterization works in dike 5 of Pontal dam, in Itabira (MG), are concluded. The structure lost its upstream characteristics and does not store tailings anymore. The work was done with the adoption of rigorous Covid-19 prevention protocols.
Since 2019, Vale already eliminated seven upstream dams in the country. The most recent, in July, was Fernandinho dam, in Nova Lima, in Belo Horizonte Metropolitan Region. In total, four structures in Minas Gerais e three in Pará were already decharacterizated and reintegrated in the environment.
Other 23 structures, all of them in Minas Gerais, will have their upstream characteristics eliminated. The projects are in action and are monitored by the regulators, Ministério Público and independent technical audits. Vale reinforces its commitment of eliminate all the upstream dams in the country, assumed in 2019, in the lower term possible, prioritizing people’s and environment’s safety.
The work conclusion of dike 5 represents an advance in the Decharacterization Program and in Vale’s commitment with a more transparent and safe management of its dams. The Decharacterization Program schedule and other information about the management of Vale’s dams are available and are regularly updated at www.vale.com/esg.
Our People
Vale publishes the Diversity, Equity and Inclusion Report
The Diversity, Equity and Inclusion report aims to increase transparency about how we are performing, objectively presenting our advances, challenges and opportunities in this long journey.
Climate Change
Vale publishes the first report on climate changes in line with the recommendations of the Task Force on Climate Related Financial Disclosures
Vale released its first report on climate changes, an initiative that reinforces the strategic importance of the subject to the company. The purpose of the document, which will be published annually, is to map the exposure of Vale's assets to climate change risks, in line with the guidelines of the Task Force on Climate-Related Financial Disclosures (TFCD) and present the resilience of the company's business strategy before climate change scenarios.
An important precautionary measure is the reduction of reliance on tailings dams in our productive processes. We have been developing alternatives to tailings dams and, with the continuous investments in dry staking tailings disposal.
5. Cultural Transformation
In order to turn Vale into one of the safest and most reliable mining companies in the world and to promote the full reparation of Brumadinho, Vale is committed to transforming its culture.
The main behaviors for the organization were defined, based on the Company’s core values: (i) obsession with safety and risk management; (ii) open and transparent dialogue; (iii) empowerment with accountability; (iv) responsibility for the whole; (v) active listening and engagement with society. All this having People in the center.
In a process of voluntary and creative co-construction, 40 leaders rescued our history and essence to create Vale’s purpose: “We exist to improve life and transform the future. Together”. The purpose drives actions and intentions and is supported by four pillars: (i) serving society, sharing value for all; (ii) doing together; (iii) using Vale’s mobilizing capacity to do something extraordinary; and (iv) transforming the future, taking care of the present.
Vale and the UN Global Compact
As described above, we are adopting and developing best practices to improve our business, with great care, while transforming our culture and initiating and accelerating critical ESG initiatives. And part of this agenda is Vale’s commitment to the UN Global Compact. The 10 Principles are a key guidance and compliance mechanism for the company and Vale remains committed to them, despite having left the initiative following the rupture of Dam I at the Córrego do Feijão mine, in Brumadinho. The company has been working diligently and is fully committed with the continuous implementation of all Global Compact principles.
.vale-esg-modelo-informacao-atualizacao-expansivel.v3 .cabeca { border: 1px solid #d3d3d3; cursor: pointer; } .vale-esg-modelo-informacao-atualizacao-expansivel.v3 .cabeca h2 { font-size: 1rem; line-height: 1.5rem; padding: 0 1.25rem 0 0; } .vale-esg-modelo-informacao-atualizacao-expansivel.v3 .cabeca h2::after { content: ''; position: absolute; height: .625rem; width: .625rem; right: 1.7rem; top: calc(50% - 0.3125rem); border-top: 2px solid #696969; border-left: 2px solid #696969; transform: rotate(225deg); transition: all .3s; } .vale-esg-modelo-informacao-atualizacao-expansivel.v3 .aberto.cabeca h2:after { transform: rotate(45deg); } .vale-esg-modelo-informacao-atualizacao-expansivel .corpo { border: 1px solid #d3d3d3; display: none; } .vale-esg-modelo-informacao-atualizacao-expansivel.v3 .aberto + .corpo { display: block; padding: 1.5625rem 1.5625rem 2.8125rem; } .vale-esg-modelo-informacao-atualizacao-expansivel.v3 .corpo:after { content: ''; display: block; clear: both; } .vale-esg-modelo-informacao-atualizacao-expansivel.v3 .aberto + .corpo > div { float: none; margin-top: .3125rem; } .vale-esg-modelo-informacao-atualizacao-expansivel.v3 .corpo p { font-size: 1rem; line-height: 2rem; } .vale-esg-modelo-informacao-atualizacao-expansivel.v3 .corpo .date { font-size: .875rem; line-height: 1rem; color: #aaa; } .vale-esg-modelo-informacao-atualizacao-expansivel.v3 .corpo .ir-para-conteudo { font-size: .875rem; line-height: 1.5; color: var(--verde-claro); text-decoration: underline; margin: 0; } .vale-esg-modelo-informacao-atualizacao-expansivel .conteudo a { color: var(--verde-claro) } @media screen and (min-width: 768px) { .vale-esg-modelo-informacao-atualizacao-expansivel.v3 .cabeca h2 { font-size: 1.5rem; } .vale-esg-modelo-informacao-atualizacao-expansivel.v3 .corpo .ir-para-conteudo { font-size: 1.125rem; } }
Vale reaffirms its commitment with the UN Global Compact Principles
21/09/24 15:00 Vale reaffirms its commitment with the UN Global Compact Principles
The rupture of the tailings dam at Córrego do Feijão in Brumadinho, Minas Gerais State, led Vale to review its governance, health and safety management, operational excellence management, including taillings, operational and business risk assessment, remediation processes as well as its Human Rights governance and management, among others.
Vale is determined to fully repair and compensate for the Human Rights impacts and damage caused by the Brumadinho tragedy. By the end of 2Q21, Vale has been intensely engaging with affected people, communities, and other stakeholders and has allocated over US$ 3.5 billion to pay for compensation to impacted people, infrastructure works and environmental and socioeconomic reparation actions. In February 2021, Vale entered into a BRL 37.7 billion Global Agreement, which includes reparation and compensatory projects, with the State of Minas Gerais, the Public Defender’s Office of the State of Minas Gerais and the Federal and State of Minas Gerais Public Ministries. This Agreement brings greater transparency, legitimacy and legal certainty to those involved. Vale will remain committed to individual indemnity agreements, which already reached 10,500 people by 2Q21.The rupture of the tailings dam at Córrego do Feijão in Brumadinho, Minas Gerais State, led Vale to review its governance, health and safety management, operational excellence management, including taillings, operational and business risk assessment, remediation processes as well as its Human Rights governance and management, among others.
1. Improvements in Governance towards Safety and Operational Excellence
- New Risk Management Policy has been defined and approved by the Board, establishing, among other measures, five Executive Risk Committees.
- Installation of the Statutory Audit Committee, in compliance with the recommendations of regulatory bodies. Creation of the Compliance Office overseeing corporate integrity and ensuring compliance with laws, regulations, policies, and procedures.
- The Compliance and Risk Committee evolved into the Operational Excellence and Risk Committee, strengthening its competence to assess corporate risk management, absorbing the duties associated with monitoring operational risks, especially geotechnical ones. The attributions related to compliance were transferred to the Statutory Audit Committee.
2. Improved Risk Management framework
1. Improvements in Governance towards Safety and Operational ExcellenceIn the aftermath of the Brumadinho dam rupture, Vale’s leadership carried out a series of measures to further strengthen the risk management governance. In 2020, the company’s governance was further refined to ensure a conservative approach on risk management:
Vale has improved its integrated Risk Management Governance flow which represents how periodic reviews are performed to ensure alignment between strategic decisions, performance, definition and monitoring of risk tolerance limits approved by the Company's Board of Directors, upon recommendation of the Executive Board.
3. Upstream Dam Decharacterization Program
One of the main initiatives to reduce the company's risk level is the decharacterization1 of all of our 30 upstream2 geotechnical structures in Brazil, including dams, dikes and drained piles - Vale’s Upstream Dam Decharacterization Program. Out of those 30, Vale completed the decharacterization of 6 upstream structures and by the end of 2021, the decharacterization of a dyke and the reinforcement of another dyke are planned.
The decharacterization process is important for the long-term risk reduction of the upstream tailings facilities. Works have been conducted with a precautionary approach, and the program’s completion is expected to occur in 2029. In that sense, downstream zones of the critical dams have been evacuated and three downstream containment structures (ECJ) to contain the tailings in a hypothetical scenario of dam rupture have been built. Further information on our Upstream Dam Decharacterization Program is available here.
1 ‘‘Decharacterization’’ means functionally reintegrating the structure and its contents into the environment, so that the structure no longer serves its primary purpose of acting as a tailings containment.
2 The upstream raising method is the same method of construction as the Brumadinho dam.
4. Tailings Dam Safety Management
Vale is focused on the evolution of its Tailings & Dams Management System ("TDMS") and has been closely monitoring its active and inactive dams. Vale’s Board of Directors approved, in October 2020, a new Policy for Dam Safety and Geotechnical Mining Structure. Among other guidelines, the policy enforces that all components of Vale’s TDMS are designed with continuous improvement elements, using and applying the best available technology and international best practices, including the International Council on Mining and Metals (ICMM) and the Global Industry Standard on Tailings Management ("GISTM") – an effort to improve safety through all phases of the tailings storage facilities lifecycle. All tailings facilities with “Extreme” or “Very high” potential consequences must be in conformance with the GISTM by August 2023. In addition, all other tailings facilities operated by Vale not in a state of safe closure will be in conformance with the GISTM by August 2025.
An important precautionary measure is the reduction of reliance on tailings dams in our productive processes. We have been developing alternatives to tailings dams and, with the continuous investments in dry staking tailings disposal.
5. Cultural Transformation
In order to turn Vale into one of the safest and most reliable mining companies in the world and to promote the full reparation of Brumadinho, Vale is committed to transforming its culture.
The main behaviors for the organization were defined, based on the Company’s core values: (i) obsession with safety and risk management; (ii) open and transparent dialogue; (iii) empowerment with accountability; (iv) responsibility for the whole; (v) active listening and engagement with society. All this having People in the center.
In a process of voluntary and creative co-construction, 40 leaders rescued our history and essence to create Vale’s purpose: “We exist to improve life and transform the future. Together”. The purpose drives actions and intentions and is supported by four pillars: (i) serving society, sharing value for all; (ii) doing together; (iii) using Vale’s mobilizing capacity to do something extraordinary; and (iv) transforming the future, taking care of the present.
Vale and the UN Global Compact
As described above, we are adopting and developing best practices to improve our business, with great care, while transforming our culture and initiating and accelerating critical ESG initiatives. And part of this agenda is Vale’s commitment to the UN Global Compact. The 10 Principles are a key guidance and compliance mechanism for the company and Vale remains committed to them, despite having left the initiative following the rupture of Dam I at the Córrego do Feijão mine, in Brumadinho. The company has been working diligently and is fully committed with the continuous implementation of all Global Compact principles.
Control and Management of Dams
Reduction of Sul Inferior dam’s emergency level
The Sul Inferior dam, at the Gongo Soco mine, in Ouro Preto (MG), had its emergency level reduced from 2 to 1, on June 18, 2021. The change, which reflects the increased safety and stability of the structure, is a result of a series of corrective works on the structure's slope, carried out by Vale in recent months. The improvements were monitored and certified by the technical consulting firm in charge.
The reduction in the level of emergency was filed with the competent bodies, according to guidelines established in the Emergency Action Plan for Mining Dams (PAEBM) and by the Brazilian legislation, and reported to the National Mining Agency (ANM) and to the technical audit supporting the Minas Gerais Public Prosecutor’s Office (MPMG).
Despite the increased safety, the families evacuated from the Sul Inferior dam’s Self-Rescue Zone (ZAS) will remain preventively relocated until the completion of the de-characterization process of the Sul Superior dam, located nearby.
Sul Inferior is a water and sediment containment dam, built in a single step, considered one of the safest construction methods. It is monitored 24 hours a day by the Geotechnical Monitoring Center (CMG) and is regularly inspected by internal and external teams. Vale will continue to carry out maintenance and adjustment activities so that the indicators follow the most conservative parameters established by specialized technical consultants, focusing on the safety of the people who work and live in the surroundings of the structure.
Governance
Vale informs on the report of the Independent Extraordinary Advisory Committee for Dam Safety
Vale hereby discloses to the market the final report ("Report") of the Extraordinary Independent Advisory Committee for Dam Safety ("CIAESB"), which ended its activities in May 2021.
Governance Governance
Vale releases the Accountability Report on the CIAE-A Recommendations Vale releases the Accountability Report on the CIAE-A Recommendations
Announced on January 27, 2019, the Independent Extraordinary Advisory Committee of Investigation (CIAE-A) was constituted by the Company's Board of Directors, under the coordination of ex-minister Ellen Gracie, dedicated to investigating the causes and responsibilities of the dam B1 rupture, at the Córrego do Feijão mine, in Brumadinho.
In 2019, the Committee met 49 times and, since its creation, it carried out several verification activities - such as interviews with key people to understand the event, document analysis, visits to the site, among others. The Committee also engaged with the authorities responsible for other related investigations and monitored the work of the various established parliamentary committees, in order to obtain relevant information from a variety of sources. The work of the Investigation Committee was also monitored directly by Vale’s Board of Directors and Fiscal Council, through periodic reports. In all cases, the independence of the Committee, including budgetary, is safeguarded.
The result of its work was made available in a report to the Board of Directors and its summary was released to the market to ensure accountability to society. Such report brought recommendations of a technical and governance nature. Most of the recommendations refer to topics that are already being addressed by Vale through various initiatives to improve its internal controls. The executive summary of the report is available click here.
Vale defined the deadlines for actions to comply with the recommendations brought by the CIAE-A report. By the end of 2020, 92% of these actions had been completed and the schedule indicates that all actions will be completed by December 2022.
To access the Accountability Report to CIAE-A Recommendations, prepared under the coordination of Vale's Audit Committee, and the complete work schedule, click here (in Portuguese, only).
Control and Management of Dams
Reduction of the emergency level of the Doutor Dam
The Doutor dam, at the Timbopeba mine, in Ouro Preto (MG), had its emergency level reduced from 2 to 1, on May 18, 2021. The change, which reflects the increased safety and stability of the structure, is a result of a series of actions that have been carried out by Vale in recent months. Among them, geotechnical investigations, maintenance of pumping to reduce the water level in the reservoir and improvement works on the left abutment, one of the sides of the dam. These actions were monitored and certified by the responsible technical consultancy.
The reduction in the level of emergency was filed with the competent bodies, according to guidelines established in the Emergency Action Plan for Mining Dams (PAEBM) and by the Brazilian legislation, and reported to the National Mining Agency (ANM) and to the technical audit supporting the Minas Gerais Public Prosecutor’s Office (MPMG).
Despite the increased safety for the community of Antônio Pereira and Vila Residencial Antônio Pereira, families that have been removed from the Self-Rescue Zone (ZAS) of the Doutor dam will remain preventively relocated until the structure's decharacterization process is completed.
The Doutor dam is monitored 24 hours a day by the Geotechnical Monitoring Center (CMG) and is regularly inspected by internal and external teams. Vale will continue to act in compliance with the best international engineering practices, focusing on the safety of the people who work and live close to the structure.
Sustainability
Vale launches its first Integrated Report, with the results of the management of material topics, updated in 2020 after consultation with its main stakeholders
In 2021, the Integrated Report was launched replacing the Sustainability Report. With a more concise approach and greater focus on the ESG strategy, the document was prepared according to the guidelines of the International Integrated Reporting Council (IIRC), in addition to the Global Reporting Initiative (GRI) Standards.
Control and Management of Dams
Vale informs on Stability Condition Declarations
Vale informs, regarding the semiannual submission to the National Mining Agency (ANM) of the regular safety inspection reports (RISR) related to the Company's dams, as defined by the National Dam Safety Policy, under the terms of Ordinance 70.389/2017 DNPM/ANM, that the company updated its information on the agency’s registry on March 31, 2021.
Among the 104 structures included in ANM’s Integrated Management System for Safety of Mining Dams - SIGBM, the Company informs that 75 structures of its operational units of Ferrous Minerals and Base Metals in Brazil now have positive Stability Condition Statements (DCEs), an increase of 3 structures in relation to February 2021.
As of today, three additional structures have positive DCEs and, as a result, their emergency protocol at level 1 is removed. They are: (i) Capim Branco, Mina Jangada, Brumadinho, MG; (ii) Menezes II, Córrego do Feijão Mine, Brumadinho, MG; and (iii) Taquaras, Mina Mar Azul, Nova Lima, MG. The security conditions of these structures were considered adequate by the EoRs after the adoption of measures to improve safety.
A total of 29 structures in the Ferrous Minerals business do not have positive DCEs today, having active emergency protocols, according to the respective PAEBM, 18 of which are at emergency level 1, 8 at emergency level 2 and 3 at emergency level 3. All 11 structures related to the Base Metals business have positive DCEs.
Governance
Call Notice for Annual and Extraordinary General Meetings
Vale informs that, on this date, the Company's Board of Directors approved the call notice for the Annual General Meeting and Extraordinary General Meeting, to be held on April 30, 2021, at 10 a.m., Brasilia time, exclusively through virtual means, under the terms of the call notice.
On the occasion, the shareholders will have the opportunity to elect Vale's Board of Directors for the 2021-2023 term, among other deliberations provided for in the agenda. The Management Proposal is available for consideration and, to assist shareholders in the analysis of the items in the Meetings' Agenda, we invite shareholders to access Vale's 2021 Proxy Statement.
Shareholders may exercise their voting rights by means of: (i) absentee ballots, by submitting voting instructions prior to the Meetings; or, (ii) participation via electronic system at the time of the Meetings.
The documents related to the Meetings, listed below, are available here.
Control and Management of Dams
Itabiruçu dam emergency level removal
Vale informs that, in line with its iron ore production resumption plan, the emergency level of the Itabiruçu dam, located at the Itabira Complex, has been removed after a thorough analysis of its geotechnical characteristics. As of this moment, the dam is in compliance with the legal safety parameters and released.
Control and Management of Dams
Vale informs on the Norte/Laranjeiras dam
Vale informs that today it started, on a preventive basis, the Level 2 emergency protocol for the Norte/Laranjeiras dam, of the Brucutu mine, in the municipality of Barão de Cocais, MG.
Water
Vale updates its water page with the result of the sensitivity analysis related to water risks
Our Strategy and Commitments
Vale updates its action plan to close the ESG gaps
Our Strategy and Commitments
Performance
Vale updates its environmental compliance section with information on fines and environmental incidents
Control and Management of Dams
Vale updates the de-characterization timeline of its geotechnical structures
Biodiversity
Learn more about Vale's actions to help protect the Amazon
Vale has been in the Amazon for more than 30 years helping to protect approximately 800 thousand hectares of rainforest in partnership with Brazil’s ICMBio.
Presentations
Vale updates its ESG Portal with a new section comprising presentations related to the ESG theme
Control and Management of Dams
Vale updates its Control and Management of the Dams page with technical reporting on level of humidity and dams level
Brumadinho
Vale updates timeline to address the recommendations presented in the final report from the Investigation Committee (CIAE-A)
Control and Management of Dams
Vale informs on Paracatu and Patrimônio dikes and Stability Condition Declarations
Vale informs that, in line with the continuous monitoring of the safety conditions of its geotechnical structures, and as a result of regular inspections and frequent interpretations of data related to the structures, performed through the function of the Engineer of Record (“EoR”), it started today, on a preventive basis, the Level 1 emergency protocol of the Paracatu and Patrimônio dikes, a protocol that does not require the evacuation of the population downstream of the structures.
Impact to Communities
Vale updates its Grievance Mechanisms section with information on its management, channels, types of interactions and indicators' performance
Ethics and Transparency
Vale updates its Ethics and Transparency page with its first annual Tax Transparency Report, as part of Vale's new pact with society and aligned with its ESG agenda
Vale informs that it has published today, its first annual Tax Transparency Report as part of our new pact with society and journey to better engage our stakeholders.
In 2019, Vale paid US$ 4.5 billion in taxes and royalties globally, of which more than 90% (US$ 4.2 billion) were paid in Brazil, where most of our operations are carried out. The amount of US$ 4.5 billion in taxes and royalties paid in 2019 corresponds to more than 10% of Vale’s total economic contribution last year. In addition to tax payments, this contribution includes operational costs, salaries and employee benefits, among others.
The report sets out the principles behind Vale’s approach to tax and investment. It includes information about corporate income taxes, tax on mining, payroll taxes, tax on products and services and other taxes, providing data on the taxes paid in Brazil, Canada, Indonesia, Mozambique and New Caledonia.
With this publication, Vale meets with one year in advance its commitment to deliver a detailed tax transparency report as part of its ESG agenda. According to an action plan to fulfil Vale’s ESG reporting commitment, the report was originally scheduled to be published in 2021.
The disclosure of the Tax Transparency report demonstrates Vale’s commitment to transparency as it follows the principles recommended by international entities such as the International Council on Mining and Metals (ICMM) and the Extractive Industries Transparency Initiative (EITI).
Control and Management of Dams
Vale informs on Barragem 5
Vale informs that today it started, on a preventive basis, the Level 1 emergency protocol for Barragem 5, at Mina da Mutuca, Nova Lima (Minas Gerais), a protocol that does not require the evacuation of the population downstream of the dam. This tailings dam was built with compacted soil, with a downstream construction method and no longer receives mining tailings.This protocol is a preventive measure.
Vale informs that today it started, on a preventive basis, the Level 1 emergency protocol for Barragem 5, at Mina da Mutuca, Nova Lima (Minas Gerais), a protocol that does not require the evacuation of the population downstream of the dam. This tailings dam was built with compacted soil, with a downstream construction method and no longer receives mining tailings.This protocol is a preventive measure.
go-to-the-content
Governance
Vale announces Nomination Committee
Vale informs that, on the present date, the Board of Directors has decided to create and establish the Nomination Committee, another important step towards Vale's corporate governance evolution, in which a specific body will directly assist the Board of Directors, proposing improvements related to the structure, size and composition of the Board, in addition to recommending the skills, profiles and potential nominees for the Board, so that Vale continues to benefit from the plurality of arguments and a decision-making process with quality and care, in compliance with laws, ethics and best corporate governance practices.
Governance
Vale announces Chief Compliance Officer
Vale informs that, from this date onwards, Denis Cuenca takes on as Chief Compliance Officer (“CCO”), reporting directly to the Board of Directors and, will be responsible for the compliance office, including the integrity department, the internal audit and the whistleblower channel.
Policies and Corporate Documents
Vale updates its Climate Change Policy with the guidelines and principles to become carbon neutral by 2050
Vale seeks to be a tireless protagonist towards the neutrality of GHG emissions in the steel, metallurgical and shipping industries and in this sense and in this context, the company updated its climate change policy with strategies to become carbon neutral by 2050.
Control and Management of Dams
Vale discloses detailed information on its dams aligned with its commitment to transparency regarding dams' management
Check out detailed information about Vale's structures in the Technical Reports section of our Dam Control and Management page.
Our Strategy and Commitments
Vale updates about its ESG action plan including the milestones for the initiatives planned to be completed in 2020
To know Vale's ESG Action Plan, access Our Strategy and Commitments page.
Board of Directors and Leadership
Vale updates the profile of its Board of Directors and includes information regarding the Audit Committee
Vale updated about its Board and Leadership page with information on the Board of Directors' members, assessment processes, among others. Besides that, the page contains uptades about Vale's Committees, including the Audit Committee established in March 2020.
Compensation
Vale brings analysis and discussion on executive compensation and 2019 and 2020 annual bonus panel
Vale updates its Compensation page with an analysis and discussion on the compensation of its executives and informations regarding the 2019 e 2020 annual bonus panel.
Vale informs on 6, 7A and Area IX dams
<div class="corpo bg-branco"> <div class="date"> 20/06/09 9:15 </div> <div class="pb-2 mb-md-1"> <div class="conteudo w-100 mb-0"> <p> <style type="text/css"><!--td {border: 1px solid #cccccc;}br {mso-data-placement:same-cell;}--> </style> Vale informs that today it started, on a preventive basis, the Level 1 emergency protocol for dams 6 and 7A, at the Águas Claras Mine, Nova Lima (Minas Gerais) and the Area IX dam, at the Fábrica Mine, Ouro Preto (Minas Gerais), all of them inactive, protocol that does not require the evacuation of the population downstream of the dam.<br /> </p> </div> </div> <a class="ir-para-conteudo" target="_blank" href="https://api.mziq.com/mzfilemanager/v2/d/53207d1c-63b4-48f1-96b7-19869fae19fe/34ba8c89-b2da-4a61-bab7-81e427a48078?origin=1"> go-to-the-content </a> </div> </div> <style nonce="UzD52XnslSw/AdJHvQEGiw=="> .vale-esg-modelo-informacao-atualizacao-expansivel.v3 .cabeca { border: 1px solid #d3d3d3; cursor: pointer; } .vale-esg-modelo-informacao-atualizacao-expansivel.v3 .cabeca h2 { font-size: 1rem; line-height: 1.5rem; padding: 0 1.25rem 0 0; } .vale-esg-modelo-informacao-atualizacao-expansivel.v3 .cabeca h2::after { content: ''; position: absolute; height: .625rem; width: .625rem; right: 1.7rem; top: calc(50% - 0.3125rem); border-top: 2px solid #696969; border-left: 2px solid #696969; transform: rotate(225deg); transition: all .3s; } .vale-esg-modelo-informacao-atualizacao-expansivel.v3 .aberto.cabeca h2:after { transform: rotate(45deg); } .vale-esg-modelo-informacao-atualizacao-expansivel .corpo { border: 1px solid #d3d3d3; display: none; } .vale-esg-modelo-informacao-atualizacao-expansivel.v3 .aberto + .corpo { display: block; padding: 1.5625rem 1.5625rem 2.8125rem; } .vale-esg-modelo-informacao-atualizacao-expansivel.v3 .corpo:after { content: ''; display: block; clear: both; } .vale-esg-modelo-informacao-atualizacao-expansivel.v3 .aberto + .corpo > div { float: none; margin-top: .3125rem; } .vale-esg-modelo-informacao-atualizacao-expansivel.v3 .corpo p { font-size: 1rem; line-height: 2rem; } .vale-esg-modelo-informacao-atualizacao-expansivel.v3 .corpo .date { font-size: .875rem; line-height: 1rem; color: #aaa; } .vale-esg-modelo-informacao-atualizacao-expansivel.v3 .corpo .ir-para-conteudo { font-size: .875rem; line-height: 1.5; color: var(--verde-claro); text-decoration: underline; margin: 0; } .vale-esg-modelo-informacao-atualizacao-expansivel .conteudo a { color: var(--verde-claro) } @media screen and (min-width: 768px) { .vale-esg-modelo-informacao-atualizacao-expansivel.v3 .cabeca h2 { font-size: 1.5rem; } .vale-esg-modelo-informacao-atualizacao-expansivel.v3 .corpo .ir-para-conteudo { font-size: 1.125rem; } } </style> <script nonce="UzD52XnslSw/AdJHvQEGiw=="> $(function(){ const templateElement = document.querySelector('#informacao-atualizacao-expansivel-dihj_ > .cabeca'); templateElement.addEventListener('click', abrirElemento); function abrirElemento() { if (templateElement.classList.contains('aberto')) { templateElement.classList.remove('aberto'); } else { templateElement.classList.add('aberto'); } } // abrir card de acordo com parâmetro da URL const param = 'updtTitle'; const url = new URL(window.location.href); const updtTitle = url.searchParams.get(param); const tituloCard = "Vale informs on 6, 7A and Area IX dams"; if (tituloCard && tituloCard === updtTitle) { abrirElemento(); deslizarAteCard(); } function deslizarAteCard(){ const headerOffset = 80; const elementPosition = templateElement.getBoundingClientRect().top; const offsetPosition = elementPosition + window.pageYOffset - headerOffset; window.scrollTo({ top: offsetPosition, behavior: "smooth" }); } }); </script>Climate Change
Vale informs on climate agenda and commitment to the Paris Agreement
Rio de Janeiro, May 14th, 2020 – Vale S.A. ("Vale") informs that it will invest at least US$2 billion to reduce by 33% its direct and indirect absolute emissions (scopes 1 and 2) by 2030. Direct emissions come from operations, and indirect emissions come from external sources involved in the production process, such as electric power consumption. The goal is aligned with the Paris Agreement, which established a maximum limit for increasing the global average temperature of 2°C by 2100.
The investment amount, already included in Vale's capex guidance for the coming years, is the largest amount ever committed by the mining industry to fight climate change. With this initiative, Vale aims to transform itself into a company with zero net emissions in scopes 1 and 2 by 2050, leading the industry towards carbon-neutral mining. Details on the scope 1 and 2 target were unveiled by Vale's CEO, Eduardo Bartolomeo, during a conference with investors. Click here to access the full presentation.
This initiative is an evolution on Vale's climate agenda. In December at Vale Day – a meeting with market analysts held in New York and London – Vale had announced its goal to reduce its emissions and established an internal carbon pricing of US$50 per metric ton of CO2 equivalent, for capital projects and competitors.
"This agenda is a result of a listening process, aligned with a real climate change-related demand from society for a robust reduction of emissions in the scope 1 and 2. We are stepping forward to develop a New Pact with Society with more transparency and responsibility", comments Eduardo Bartolomeo.
Since Vale Day, the Low Carbon Forum was established – a group led by the CEO and composed of six executive officers and employees from different areas of the company – whose purpose is to guide the implementation of the commitments made. The initiative reflects the engagement of Vale's management on the issue, as well as, the constant evolution on the climate agenda. According to Luiz Eduardo Osorio, the executive officer for Institutional Relations, Communication and Sustainability, 35 initiatives are under analysis using the "Marginal Abatement Cost Curve" – a tool that allows the classification of projects by costs and potential for reducing emissions.
"There are projects for the use of biodiesel in Base Metals, energy efficiency, electrification of mines and railroads, biofuels in pelletizing instead of coal, and renewable energy, since one of Vale's goals is to achieve 100% of self-production of electric power from clean sources, such as wind and solar, in its plants around the world," explains Luiz Eduardo Osorio.
By the end of the second half of this year, some pilot projects will be in operation. Vitória-Minas railway (EFVM) will have the first 100% electric locomotive. Electric vehicles will be tested in underground operation at Creighton, Coleman and Copper Cliff's mines in Canada and Vale's pelletizing plant in Vitória (Espirito Santo) will be tested with biofuel.
The base year used to calculate the carbon goal was 2017, when Vale's emissions reached 14.1 million metric tons of CO2 equivalent (MtCO2e). The goal is to reduce it to 9.5 MtCO2e by 2030. In parallel, the projects to disassociate its production from carbon emissions, Vale will recover and protect another 500 thousand hectares of native forest by 2030. Today, the company helps to protect more than 1 million hectares worldwide.
Scope 3
In addition to its ambition to neutralize its scopes 1 and 2 carbon emissions by 2050, Vale aims to establish a goal for scope 3 to encourage clients and suppliers in the same direction. Through active engagement with clients from the steel and metallurgy industries, Vale will work to reduce emissions in its value chain. The company will guide its operations based on win-win relationships, less intensive products, and new technologies
Control and Management of Dams
Vale informs on Dicão Leste dam
Vale informs that it has initiated, in a preventive manner, the Level 1 emergency protocol of the Dicão Leste dam, of the Fazendão Mine in Catas Altas (MG), a protocol that does not require the evacuation of the population downstream of the dam.
Actions to Support the States – R$131.7 million
Vale has already allocated R$352.8 million to tackle the new coronavirus in Brazil
Health and Safety
It amounts to almost 70% of the total of R$500 million that the company has allocated to invest in humanitarian actions
Vale has already allocated R$352.8 million to tackle the new coronavirus (SARS-CoV-2) in Brazil. It amounts to almost 70% of the total of R$500 million that the company has allocated to invest in humanitarian aid to fight against the spread of the disease. More than 600 tons of inputs have been purchased in China – rapid test kits and personal protective equipment (PPE) – to support the Federal Government and the States where Vale operates (Minas Gerais, Pará, Maranhão, Espírito Santo, Mato Grosso do Sul, and Rio de Janeiro). The first batch arrived in late March and the last will be delivered in May.
This emergency aid, which represents an investment of R$223.3 million, complies with the guidance of health authorities. The cargo, equivalent to the average weight of 600 automobiles, is being transported by 15 airplanes – 13 cargo aircrafts and two airliners. Vale has also taken other humanitarian actions totaling R$129.5 million.
Five million rapid test kits and 15.8 million PPE are being donated to the Federal Government. The company will also provide almost 14.5 million inputs, including kits and PPE, to the six States where it operates. The cargo also includes five million kits purchased by Brazilian banks with Vale’s logistical support in China, thanks to its 50-year partnership with that country. To bring all this cargo of more than 600 tons, Vale mobilized 116 employees from nine areas of the company in Brazil and China.
More than Inputs
However, humanitarian actions are not limited to the acquisition of inputs. The company has helped to build field hospitals, refurbish hospitals, purchase equipment – such as ventilators, hospital beds, and monitors –, as well as donate cleaning materials and 100 tons of alcohol-based hand sanitizers. Aiming to guarantee the social isolation of indigenous peoples and traditional communities with which it interfaces, the company will build quarantine centers with all the required logistical support.
In partnership with Hospital Israelita Albert Einstein and the Mater Dei Health Network, Vale has launched a US$1 million public notice (almost R$5 million at the average dollar exchange rate in March) to support innovative solutions aiming to reduce the impact of COVID-19 – the disease caused by the new coronavirus.
And R$2 million was donated to the State Brain Institute to purchase equipment. The Institute, part of a 10-year partnership with Vale, has become a reference in Rio de Janeiro for hospitalization and treatment of the disease.
These are the main humanitarian actions already taken by Vale to tackle the COVID-19:
Actions to Support the Federal Government – R$213.8 million
- Five million rapid test kits for virus detection;
- 15.8 million PPE (2.54 million N95 masks, 10.8 million surgical masks, 216 thousand gloves, 2.24 million aprons, and 4.5 thousand goggles).
Actions to Support the States – R$131.7 million
- 14.5 million inputs, including test kits and PPE, for the six States where the company operates (Minas Gerais, Pará, Maranhão, Espírito Santo, Mato Grosso do Sul, and Rio de Janeiro);
- Construction of three field hospitals in Parauapebas (Pará), Açailândia (Maranhão), and in the city of Rio de Janeiro;
- Refurbishment of three hospitals – two in Minas Gerais (Itabira and Belo Horizonte) and one in Pará (Parauapebas);
- Donation of R$2 million to the State Brain Institute to purchase equipment for brain monitoring, ultrasound, and monitoring robots, among other hospital items. The Institute, part of a 10-year partnership with Vale, has become a reference in Rio de Janeiro for hospitalization and treatment of the disease;
- Logistical support for transportation of hospital equipment;
- Support to the City Government of Parauapebas (Pará) to identify the epidemiological profile of COVID-19 in the municipality through the application of PCR tests by sampling of the population;
- Purchase of 390 hospital equipment (mechanical ventilators, beds and monitors) for four hospitals in Pará: Parauapebas Municipal Hospital, Canaã Municipal Hospital, Yutaka Takeda Hospital and Cinco de Outubro Hospital;
- Donation of 81 thousand items for cleaning, in addition to 100 tons of alcohol-based hand sanitizers and personal hygiene kits to 14 prisons in 13 cities in Minas Gerais;
- Donation of five containers with air conditioning and stretchers to Santa Casa de Ouro Preto (Minas Gerais), which will be used as the first aid center for suspected cases of the new coronavirus;
- Three ambulances to the city of Mariana. The vehicles are equipped with Intensive Care Units (ICU) and respirators for two of them;
- Acquisition of medical and hospital supplies for a hospital in São Luís (Maranhão);
- Anticipation of the donation of five rescue and fire-fighting vehicles to the Fire Department in Maranhão. These vehicles will provide assistance to tackle the COVID-19 in the cleaning of public areas;
- Donation of two solenoid valves to create a prototype of respirator in São Luís.
Actions to Support the Indigenous People and Guilombola Communities – R$2.3 million
- Construction 15 Quarantine Units in Minas Gerais and Espírito Santo to serve the Tupiniquim, Guarani, Krenak and Pataxó ethnic groups that interface with Vale, in addition to the other indigenous peoples from these States;
- Construction of the Quarantine Center for Awá, Guajajara and Ka’apor indigenous peoples, the health professionals for indigenous peoples, and Funai in Santa Inês (Maranhão) (The Technical Cooperation Agreement is under development with Legal and Procurement areas);
- Emergency accommodation support (14 nights) for two Awá families (five indigenous people);
- Donation of cleaning kits to 475 Quilombola families, fish farmers, and artisanal fishermen from Sepetiba bay (Rio de Janeiro);
- Donation of cleaning kits to 10,000 indigenous families in Minas Gerais, Maranhão, Espírito Santo, and Pará.
Other Actions – R$5 million
- Vale, in partnership with Hospital Israelita Albert Einstein and the Mater Dei Health Network, has launched the COVID-19 Challenge public notice to support solutions that reduce the impacts of COVID-19, focusing on the areas of prevention and tracking of risk, screening and diagnosis, monitoring and follow-up of patients, as well as intensive care. Support will be provided in the form of funding or by connecting partners to enable the implementation of such solutions within 15 days. The maximum investment will be US$1 million (almost R$5 million at the average dollar exchange rate in March). Over 1,400 proposals have been submitted. The result of this challenge will be disclosed on the 24th.
Aid to the Suppliers – R$1 billion
At the end of March, mining was declared an essential service by the Ministry of Mines and Energy and, as a result, Vale maintains its activities. To ensure the financial health of its suppliers, the company announced a package of almost R$1 billion, which will benefit almost three thousand suppliers across the country.
The company has been taking several actions to ensure the health of direct and third-party employees. They include implementing home office for eligible functions, implementing leave of absence for employees over 60 years old or with pre-existing diseases (who were instructed to be at home), and the installation of 81 thermal cameras at the entrance of its facilities to identify the temperature of direct and third-party employees, among other measures. All measures taken by Vale comply with the health and safety protocols established by health authorities in regard to the new coronavirus pandemic.
Control and Management of Dams
Vale informs on the Taquaras dam
٢٧/٠٤/٢٠ ١٢:٠٠ ص Governance
Vale, following the Notice to Shareholders published on 03/30/2020 and 04/15/2020 (“Notices to Shareholders”), informs that, due to the coronavirus pandemic (Covid-19) and pursuant to CVM Instruction No. 622/2020, the Company's Ordinary and Extraordinary Meetings of Shareholders (“AGM/E”) will be held, cumulatively, on 04/30/2020, at 10 am, exclusively by digital means. The Company also informs on the flexibility of the date for sending the distant voting ballot (“BVD”) directly to Vale. Vale informs on holding its meetings of 04/30/2020 exclusively by digital means
go-to-the-contentVale, following the Notice to Shareholders published on 03/30/2020 and 04/15/2020 (“Notices to Shareholders”), informs that, due to the coronavirus pandemic (Covid-19) and pursuant to CVM Instruction No. 622/2020, the Company's Ordinary and Extraordinary Meetings of Shareholders (“AGM/E”) will be held, cumulatively, on 04/30/2020, at 10 am, exclusively by digital means. The Company also informs on the flexibility of the date for sending the distant voting ballot (“BVD”) directly to Vale.
Sustainability Report
Vale's Sustainability Report 2019
The Sustainability Report presents Vale’s actions and learnings from the breach of Dam I of the Córrego do Feijão mine, in Brumadinho (Minas Gerais, Brazil). It also describes the managerial changes made to business processes since the event, in addition to economic, environmental and social performance of the organization.
Suppliers
Vale Updates About Temporary Aid Package for Suppliers
Vale announces that has already anticipated R$521 million in payments to small and medium-sized companies since the beginning of the crisis caused by the COVID-19 pandemic. The company plans to inject another R$411 million into the Brazilian economy in advance of payments until the end of April, totaling R$932 million to help almost 3,000 suppliers in Brazil to address this moment.
Control and Management of Dams
Vale Informs on Stability Condition Declarations
Vale informs that it continues to improve its Tailings Management System (“TMS”), with the support of international experts, and brings updates regarding its structures.
Governance
Vale Announces Alternative Measures for Holding its Meeting of Shareholders on 04/30/2020
Vale has been following the evolution of the coronavirus outbreak (Covid-19) in Brazil and aiming to preserve the integrity of its employees, service providers and shareholders at the Annual Extraordinary and General Meetings’ (“AGM/E”), which will be held, cumulatively, on April 30th, 2020, the Company encourages the remote participation of shareholders as an option for in-person participation.
Governance
Vale Announces Final Composition of the Audit Committee
Vale in continuity with the press release dated March 11th, 2020, informs that the Board of Directors appointed the third member to compose the Audit Committee.
Suppliers
Vale Announces Temporary Aid Package for Suppliers
Vale discloses a series of support initiatives for its suppliers during a crisis caused by the coronavirus epidemic.
People and Community
Vale Brings 5 Million Test Kits and Medical Supplies to Brazil, in Humanitarian Aid
Vale has closed the purchase of 5 million new coronavirus (Covid-19) rapid test kits to help the Brazilian government combat the spread of the illness in the country.
Brumadinho
Vale Presents a Timeline of Implementation of CIAE-A Recommendations
Vale disclosure a timeline with actions and deadlines to adress the recommendations presented in the final Report of the Independent Committee for Extraordinary Assessment (CIAE-A)
Governance
Notice of Meetings of Shareholders
Vale has released the documents for the Annual and Extraordinary Meetings of Shareholders, to be held on April 30, 2020.
Audit Committee and the Compliance Department
Vale informs about the new Audit Committee, its function and composition, in order to further evolve in the aspects of Corporate Governance.
Reparation
Update on Gongo Soco
Vale continue to monitor and report to authorities about the Gongo Soco mine. The construction of the tailings containment structure located in the proximity of the Sul Superior dam was completed.
Indigenous Peoples and Traditional Community
Mining in Indigenous Lands
Vale states on the new Bill 191/2020 which is being processed in the National Congress and aims to regulate economic activities, such as Mining, in Indigenous Lands.
Brumadinho
Report from Support and Reparation Committee
Final report prepared by the Extraordinary Independent Consulting Committee for Support and Reparation was released with recommendations and monitoring of action plans related to the Brumadinho event.
Investors
Support on MV Stellar Banner Vessel
Vale is committed with all efforts and resources to mitigate the possible impacts related to the incident with the MV Stellar Banner vessel, owned and operated by the South Korean.
Brumadinho
Report from Investigation Committee
The summary of the report prepared by the Extraordinary Independent Consulting Committee for Investigation for Investigation was released with recommendations of a technical and governance nature.
Control and Management of Dams
Update on the Decharacterization Plan
Vale update on the decharacterization plan, including Doutor and Campo Grande dams and the three drained stacks structures.
Our Strategy and Commitments
ESG Gaps Action Plan
Vale is announcing new commitments for 2030 and, in addition, mapped its GAPs in ESG and brought them together in an Action Plan for monitoring and alignment with best practices. Check out the action plan.
Investors
Partial Stoppage in Brucutu
The temporary suspension of disposal of tailings of the Brucutu was a proactive conservative measure of the company while assessing the dam’s geotechnical characteristics.