Hazard Identification and Risk Analysis (HIRA)
Identify and assess high-severity or large-extent operational hazards
Identify and establish performance criteria
Ensure appropriate critical controls are in place

Task Risk Analysis (TRA)

Permit to Work (PtW)




Critical Activities Requirements (CARs)
CARs are life-saving requirements that employees are required to apply in tasks classified as critical due to historical fatalities and serious accidents within Vale and the broader mining industry.
Activities identified as posing a high safety risk to employees include:

Working at height

Light commercial vehicles

Mobile equipment operation

Molten metal

Blocking, identification and zero energy

Lifting

Confined spaces

Machine guarding

Ground activities

Explosives

Electrical work

Liquid metal

Hot work

Opening of lines and equipment

Molten metal

Molten metal
Heading Example
Heading Example
Emergency Response Plan
All dams in Brazil that are subject to the National Dam Safety Policy (PNSB) have developed site-specific Mining Dam Emergency Response Plans. These plans outline actions to be taken in response to an emergency in order to minimize impacts on communities, the environment and cultural heritage in downstream areas.
Learn more here.

Learn more
Environmental incidents
In 2025, we achieved an 89% reduction in environmental incidents compared to the previous year, and we have recorded no critical or highly critical events since 2023. This reflects our progress in managing environmental control and prevention systems.
All environmental incidents follow global management guidelines, which include:
- Initial communication (internal and external);
- Adoption of immediate and control actions;
- Root cause investigation and implementation of corrective actions;
- Scope analysis and preventive actions;
- Lessons learned documentation and internal dissemination.
Total environmental incidents
| 2021 | 2022 | 2023 | 2024 | 2025 | |
|---|---|---|---|---|---|
Total incidents*
|
33
|
24
|
16
|
9
|
1
|
Critical and highly critical incidents
|
0
|
0
|
1
|
0
|
1
|
Environmental incidents and impacts in 2025
| Country | Incidents | Environmental impacts |
|---|---|---|
Malaysia
|
1
|
Water quality alteration
|