Control and Management of Dams

Vale's PDE3 dam obtains positive DCE and is out of emergency situation

11-9-23 19:50

The PDE3 dam, located at the Brucutu mine in São Gonçalo do Rio Abaixo (MG), obtained a positive Declaration of Stability Condition (DCE), certifying the safety of the structure, and its emergency level was closed on last Tuesday (5/9). Since early 2023, three dams have been removed from emergency levels. In addition, eight other Vale structures had their emergency levels closed in 2022. Of the 20 that remain on emergency level, all that have received tailings are inactive and 11 are in the process of being de-characterized. These dams are continuously monitored and receive ongoing actions to improve safety.

The PDE3 dam underwent reinforcement works that confirmed the dam's safety and stability conditions, allowing it to be removed from the emergency level and the DCE to be obtained. The structure contains approximately 70,000 m³ of sediment and was constructed using the single-stage method.

 

Read more here (portuguese only) and on our Dams page.

Our Strategy and Commitments

Statement on PT Vale Indonesia Tbk

29-8-23 22:35

Vale's Base Metals business holds 43.34% of PT Vale Indonesia Tbk (‘PTVI’ or ‘the Company’), making Vale SA an indirect shareholder through its Base Metals ownership. Our operational focus centers in Sorowako, South Sulawesi, consisting of mining, smelting, and refining activities. PTVI's growth projects align with Indonesia's ambition to become a global electric vehicle hub, with ongoing initiatives in Central, South, and Southeast Sulawesi. PTVI is listed on the Indonesia Stock Exchange. Learn more at www.vale.com/indonesia.

This statement provides clarification of some key socio and environmental topics related to our activities in the region.

PTVI has pursued sustainable nickel mining and processing excellence since its establishment in 1968 and remains committed to ethical practices and ESG principles. Our interactions with local communities are rooted in dialogue and mutual agreement, ensuring just compensation in line with legal norms. PTVI undertakes a formal grievance process upon receipt of any stakeholder complaint. We actively address unauthorized encroachments within our concession area and collaborate with relevant authorities to ensure compliance. Any activities related to relocation and compensation adhere to the International Finance Corporation's Performance Standards on Environmental and Social Sustainability and other internationally recognized best practice frameworks. Farmers, for instance, who have been subject to involuntary displacement have been duly compensated.

Respecting Human Rights is a paramount concern for PTVI. Our Code of Conduct (CoC) and Human Rights Policy are aligned with international standards, including the Universal Declaration of Human Rights, the UN Guiding Principles on Business and Human Rights, and the Voluntary Principles on Security and Human Rights. We emphasize open dialogue with local communities and authorities to resolve conflicts. Our commitment to Human Rights training for all security personnel, as outlined in our CoC, underscores this commitment. Reports of threats or harassment are treated seriously and reported to authorities as per national legislation. In compliance with Indonesian laws and regulations, PTVI reports acts of violence and disruption of mining activities through non-peaceful demonstrations, such as a recent occurrence near the Asuli and Lembo South area in 2023.

 

PTVI is also dedicated to enhancing the well-being of the communities where it operates and remains committed to mitigating any risk and impact of its mining activity on the area's water quality. The local community in Asuli village historically faced limited access to water sources and relied on water storage ponds for their water supply. Prior to commencing mining activities, PTVI conducted a comprehensive hydrological analysis to minimize potential impacts on existing water sources and storage ponds. This analysis revealed that the pre-existing water storage ponds already suffered from issues of being brown and muddy with limited water volume, confirming that the poor quality of the spring water existed prior to PTVI initiating mining operations in the area. Additionally, the Lembo South block featured unauthorized pepper plantations within a protected forestry area established by local communities alongside mining activities. Based on PTVI's hydrological analysis, there is no evidence of adverse effects on water storage ponds resulting from mining activities. Despite the limited extent of our mining operations in the Lembo South Block and the absence of any negative impact on the local communities' water storage ponds, PTVI has taken proactive steps in constructing multiple water tank facilities to cater to the needs of neighboring communities, especially the Asuli village.

Moreover, PTVI has consistently upheld an exceptional water quality record. We have been and remain fully committed to ensuring the availability of clean and safe water. Within Sorowako, PTVI effectively manages over 120 wastewater treatment facilities spanning more than 250 hectares to ensure that water discharge aligns with mandated standards. Rigorous effluent sampling and testing take place on a daily basis. Collaboration with accredited independent laboratories for the collection and processing of effluents, in conjunction with regular governmental oversight and assessments, underscores our commitment to compliance. This commitment extends beyond legal requirements, exemplified by PTVI's track record of surpassing prevailing laws and regulations. PTVI is dedicated to addressing concerns related to hexavalent chromium (Cr6+) within our operations. The 2022 PTVI Sustainability Report highlights our meticulous monitoring and sampling efforts, consistently demonstrating that Cr6+ levels in effluents remain well below permissible limits.

In Sorowako, including the Asuli village, our efforts in this regard have encompassed other various initiatives as well. To facilitate easier access to safe and clean water, PTVI has implemented the provision of water tanks, bolstering local communities' water supply infrastructure. Our approach is comprehensive, incorporating hydrological analysis, the establishment of clean water sources through water tanks and borehole wells within the existing network, the identification of springs, and the installation of necessary equipment. The hydrological analysis conducted underscores that our mining activities do not have a detrimental impact on the water supply. Our engagement with communities, in tandem with our collaboration with local authorities, is well-documented. Notably, since July 2023, the community has taken charge of a self-managed water system initiated and furnished by PTVI. Through active participation, the community maintains operation and upkeep of this system, ensuring the sustained availability of clean water.

PTVI refrains from making comments on the discretionary actions of the Police and regulatory bodies and affirms our commitment to legal adherence and ethical conduct, reporting instances of violence and vandalism involving PTVI's employees, contractors, and assets in accordance with its commitment to provide a safe and healthy workplace. . Our approach to conflict resolution prioritizes open dialogue involving the community, village, sub-district, district governments, and other stakeholders. These engagements are carried out with strict observance of the existing legal framework. PTVI’s dedication to the well-being of the community is reflected in our Code of Conduct (CoC) and Human Rights Policy. In line with these commitments, all PTVI security personnel, including contractors, have undergone human rights training.

During a protest in 2023, PTVI found that the protest escalated into vandalism. To avoid potential further escalations or a hostile situation developing, PTVI reported the situation to the authorities, deferring the enforcement to them, as per applicable law. While PTVI cannot comment on police discretion, PTVI's commitment to dialogue is unwavering whilst upholding our obligation to report incidents and prioritize peaceful resolution, fostering a safe and inclusive environment. Our commitment to community safety and respecting and promoting Human Rights is again prescribed in our CoC and Human Rights Policy.

Engagement through open dialogue is a cornerstone of PTVI's approach, and we actively prioritize interactions with the local community, village leadership, sub-district and district governments, as well as other relevant stakeholders. It is crucial to note that PTVI's influence does not extend to military actions. We respect military jurisdiction and are committed to safeguarding and upholding human rights within our operations. Inquiries or concerns pertaining to military conduct should be directed to the appropriate governing bodies in Indonesia.

PTVI reaffirms our commitment to open dialogue with civil society, to promotion of community welfare, and to abiding by the highest ESG standards.

Control and Management of Dams

Vale implements GISTM at its tailing’s storage facilities

27.7.2023 18:26

Fulfilling the commitment assumed with the ICMM, with society and its employees, Vale has implemented GISTM in 48 of its 50 tailings storage facilities (TSFs), 35 of which are in the Ferrous business unit in Brazil and 13 in the Base Metals business unit (11 in Canada and 2 in Brazil). The two remaining Ferrous TSFs in Brazil have a lower consequence classification and it will comply with the standard by August 2025, following the criteria of the Conformance Protocols defined by ICMM. The 48 compliant TSFs meet the GISTM requirements, and some of them have action plans in place according to the Conformance Protocols.

To access the complete Press Release, click here.

More information about the Vale’s dams is available at www.vale.com/web/esg/

Control and Management of Dams

Vale informs that it has been denied DCOs of the PAEBMS for 4 of its structures

3-7-23 12:01

Vale informs that the Declarations of Conformity and Operability ("DCO") of the Emergency Action Plans for Mining Dams ("PAEBM") have been denied for four of its structures, namely Monjolo, ED Monjolo, Porteirinha (Piracicaba River, MG) and Dam 7 (Jeceaba, MG), in accordance with Resolution No. 95/2022 of the National Mining Agency (ANM). The DCO became mandatory in 2022 and specifically evaluates the PAEBM and related measures. The denial signals that there are actions to be taken by Vale to ensure that the referenced PAEBMs have adequate operating conditions. The company is acting to resolve the identified discrepancies as soon as possible.

Vale reiterates that the stability conditions of the four structures remain unchanged. Of the four structures, only Dam 7 was in operation for tailings disposal at the time of the assessment. Based on the negative DCO and prioritizing the best safety conditions for its employees and communities, Vale has suspended the operation of Dam 7 and related production processes until the actions related to the corresponding PAEBM are implemented.

Mr. Manuel Lino Silva de Sousa Oliveira was appointed today as Lead Independent Director of Vale's Board of Directors

29-6-23 21:59

Vale S.A. informs that Mr. Manuel Lino Silva de Sousa Oliveira was appointed today as Lead Independent Director of Vale's Board of Directors. Mr. Ollie Oliveira has been an independent member of the Company's board since 2021, with recognized performance on several international boards in the industrial area and with more than 35 years of experience in corporate finance and strategy, mainly in the mining sector.  

To access the complete Press Release, click here

And for more information, access the Board of Directors and Leadership.  
 

Ethics and Transparency

Vale released 2022 Tax Transparency Report

23-6-23 14:35

Vale released yesterday its Tax Transparency Report 2022, which details the taxes and royalties paid in Brazil, where most of our operations are located, and those paid globally to all spheres of government and by project.


We highlight the jurisdictions where we have our mining operations, since our tax contribution plays a fundamental role in supporting the communities, people and governments of the regions where we operate.
In 2022, Vale paid US$ 9.6 billion in taxes and royalties, of which US$ 8.7 billion (90%) were paid in Brazil.


Click here to access the full report.


And for additional information, please visit Ethics, Compliance and Tax Transparency.
 

Er trad een fout op.

Control and Management of Dams

The dams Área IX and Capitão do Mato are out of emergency situation and have their safety and stability certified

6-4-23 15:48

The dams Área IX (Ouro Preto) and Capitão do Mato (Nova Lima), both in Minas Gerais, obtained a positive Declaration of Stability Condition (DCE) and had the emergency level closed this week, attesting to the safety of the structures. In all, 10 of the company's dams have closed the emergency level since the beginning of 2022.


The continuous improvement in the safety conditions of Vale's dams is the result of the measures that have been implemented, such as the new management system for the company's tailings disposal structures, based on the lessons learned from the Brumadinho dam collapse and on the best and strictest practices, as defined in the Global Industry Standard for Tailings Management (GISTM).


Area IX - The Area IX dam, located at the Fábrica mine in Ouro Preto (MG), underwent a geological-geotechnical investigation campaign and received complementary instrumentation for its monitoring, which confirmed the dam's stability conditions and made it possible to obtain the DCE and emergency level removal. The structure contains around 768,000 m³ of tailings and is one of the 30 upstream dams of the company that are part of Vale's De-Characterization Program. As of 2019, 40% of them have already been eliminated, which is equivalent to 12 structures. The Area IX dam's decharacterization is expected to be completed by 2024.


Capitão do Mato - The Capitão do Mato dam is located at the Capitão do Mato mine, in Nova Lima (MG), and contains approximately 1.8 million m³ of sediments. The right shoulder region (natural terrain) of the structure received slope stabilization works and drainage improvements, which resulted in satisfactory safety and operating conditions, with the consequent issue of the DCE. The structure was built by the single stage method and has been inactive since 2019.


The actions were duly communicated to the competent agencies, according to the guidelines established in the Emergency Action Plan for Mining Dams (PAEBM) of the structures and in the current legislation, including the National Mining Agency (ANM), the Public Ministry of Minas Gerais (MPMG), the State Environment Foundation (FEAM), the State Secretariat of Environment and Sustainable Development (SEMAD) and the technical audit that accompanies the work on the structures.


For more information on the management and performance of Vale's dams, visit the Control and Management of Dams page.

Ethics and Transparency

Vale announces agreement with the United States Securities and Exchange Commission

29-3-23 13:26

Vale S.A. informs that it has entered into an agreement with the United States Securities and Exchange Commission (“SEC”). The agreement will terminate a lawsuit filed by the SEC against the Company in April 2022 and will be effective once ratified by the United States District Court for the Eastern District of New York. Under the agreement, without admitting or denying the settled claims, Vale will make payments totaling US$ 55.9 million to the SEC. In addition, the SEC will not oppose Vale’s motion to dismiss all claims that the Company acted with fraudulent or reckless intent regarding its disclosures. Vale continues with its commitment to remediate and repair the damage caused by the dam collapse in Brumadinho in 2019.

Click here to access the Press Release.

Ethics and Transparency

Vale releases its Ethics & Compliance Annual Report

10-3-23 12:37

Vale's Ethics & Compliance Program is completing two years. In line with our commitment to transparency, we are releasing the second edition of our Ethics & Compliance Annual Report, which gathers information from 2022.


In addition to Whistleblower Channel and Consequence Management data, including the number of terminations of employment in 2022, the document highlights the implementation of our new channel for employees and contractors in Brazil to report sexual harassment or discrimination with specialized and empathetic support. Information about our communication and training actions carried out last year, such as Ethics Week, is also shared in this report.


Click here to access the report. 


For more information about the Program, visit the Ethics & Compliance page.

Water

Vale will promote an event at the UN Water Conference. Participate!

2-3-23 12:37

From the 22nd to the 24th of March, Vale will participate in the UN Water Conference 2023 in New York.
The purpose of the conference is to review the implementation of the Decade Goals: Water for Sustainable Development.


In addition to being present at the conference, we will also promote a virtual Side Event: Challenges and opportunities for sustainable water management in the mining industry.


Our goal is to encourage discussion about the mining sector's relationship with water and present common challenges and best practices aiming at the rational and sustainable use of the resource.


Speakers
Bruno Ferraz (Environment Executive Manager | Vale)
Guilherme Alves (Environment Manager | Vale)
Renata Andries (Water Resources Specialist| Vale) 
David Soares (Water Resources Specialist| Vale)
Felipe Tavares (Superintendent of Hydrological and Socioeconomic Studies | ANA | National Water Agency) 
Cláudia Salles (Manager of Sustainability | IBRAM | Brazilian Mining Institute)
Valmir Pedrosa (Professor and Consultant | UFAL | Federal University of Alagoas)
Alice Castilho (Director of Territorial Management |CPRM | Geological Service of Brazil)
Luis Armacollo (Corporate Account Manager | CEBEDS representative | Brazilian Business Council for Sustainable Development)
Guilherme Freitas (Global Health, Safety and Environment Manager | NEXA)

PARTICIPATE AND HELP US SHARE THIS IDEA!

Date: March 22, 2023
Time: 1:00 pm (NY time | EDT)


To attend the event, click here.

Er trad een fout op.

Control and Management of Dams

B3/B4 dam is removed from critical safety condition

2-12-22 17:44

Vale S.A. (“Vale”) informs that the B3/B4 dam, located in Nova Lima (MG), was removed from critical safety condition as the emergency level was lowered from 3 to 2.

The progress of the dam de-characterization, with the removal of more than 50% of the tailings, improved the stability conditions of the structure and made it possible to lower the emergency level. 

The Self-Rescue Zone (ZAS) of the structure on emergency level 2 will remain evacuated and access to the ZAS area will follow legislation and regulatory bodies review. The de-characterization of the dam will continue to be carried out by remotely operated equipment and is expected to be concluded in 2025. Vale expects to lower the emergency level to 1 by the end of 2023.

Eliminating upstream structures in Brazil is one of Vale's key commitments. By 2022, 12 structures were eliminated, representing 40% of Vale's de-characterization program. 

B3/B4 dam reduction level is an important milestone for Vale and is in lline with the expectation of no dams in critical safety condition (level 3 of emergency) by 2025.
 

For more information, access Control and Management of Dams

Control and Management of Dams

Porteirinha has its emergency level 1 removed

17-11-22 12:35
go-to-the-content

Control and Management of Dams

Sul Inferior has its emergency level 1 removed

10-10-22 18:00
go-to-the-content
Er trad een fout op.
29.9.2022 18:00
go-to-the-content
Er trad een fout op.
Er trad een fout op.
Er trad een fout op.
Er trad een fout op.

Indigenous Peoples and Traditional Community

Vale updates statement on Articulation of the Indigenous Peoples (Apib) and Amazon Watch report

23-2-22 23:20

​Vale reiterates that the company has no mineral rights on Indigenous Lands in Brazil. In 2021, Vale relinquished all its mining rights on Indigenous Lands in Brazil, which includes all applications for exploration permits and mining concessions.

Vale's relinquishment is based on the understanding that mining on Indigenous Lands may only take place with the Free, Prior and Informed Consent (FPIC) from the Indigenous people themselves and based on a legal framework that adequately regulates the activity.

The relinquishment notices were filed throughout that year with the National Mining Agency (ANM, the authority for the matter in Brazil). Eventual updates in this regard in the entity's records, particularly in the updating of active applications, follow the ANM's own protocol. In this sense, Vale states that there are no 75 active applications without the corresponding communication of relinquishment of the company for exploration permits and mining concessions in polygons interfering with indigenous lands.

The company also clarifies that it maintains requests and titles for exploration permits and mining concessions in areas neighboring indigenous lands, without any intersection with demarcated areas in the country, in strict compliance with the legislation in force in Brazil, maintaining a respectful relationship with the indigenous peoples.

Vale restates that the allegations regarding the contamination of Cateté River are unfounded, based on expert reports issued by legal experts from different scientific areas, which attest that there is no causality between the Onça Puma mining operation and the alleged contamination. 

Vale's ambition is to be a partner in the development of resilient communities, engaged in relevant issues for humanity and committed to sustainable mining. For this purpose, the company has established three social commitments as part of its 2030 Agenda, which include contribute to all indigenous communities neighboring our operations in the preparation and execution of their plans to pursue the rights foreseen in the UN Declaration on the Rights of Indigenous Peoples (UNDRIP).

Finally, Vale also reinforces that it is available to clarify all points with Articulation of Indigenous Peoples of Brazil (Apib) and Amazon Watch.

Indigenous Peoples and Traditional Community

Statement on the Articulation of Indigenous Peoples of Brazil (Apib) and Amazon Watch report

22-2-22 8:30

​Regarding the report released today by Articulation of Indigenous Peoples of Brazil (Apib) and Amazon Watch, as already widely reported, Vale does not have any mineral right on indigenous land in Brazil. Last year, the company announced the relinquishment of all its mining rights in Indigenous Land in Brazil (which includes applications for exploration permits and mining concessions). The relinquishment requests were filed with the National Mining Agency (ANM) throughout 2021. This decision is based on the understanding that mining in Indigenous Land can only be carried out with the Free, Prior and Informed Consent (FPIC) of the indigenous themselves and legislation that allows and adequately regulates the activity.
The allegations about the contamination of the Cateté River are also unfounded, which has already been corroborated in expert reports prepared by judicial experts in several scientific areas, which prove that there is no causality between the Onça Puma mining operation and the alleged contamination. See more details here.
Vale also reinforces that it is available to clarify all points with Articulation of Indigenous Peoples of Brazil (Apib) and Amazon Watch.
 

​Vale thanks the New Climate Institute and Carbon Market Watch for publishing the Climate Corporate Responsibility Monitor report, which analyzes the climate change strategies of 25 large global corporations, and keeps the topic under discussion. 

Vale believes, however, that, for a future edition of the study, the authors could complement their analyses with qualification of the sectoral challenges of which the companies evaluated are part. Mining and steel are admittedly hard-to-abate sectors, whose decarbonization trajectory is marked by a high degree of uncertainty in technological routes and high decarbonization costs.

Vale's decarbonization strategy is public and based on a global policy. Vale's annual climate change performance is evaluated by specialized institutions such as Sustainalytics, Climate Action 100+, RFC Ambrian, among others. The company even received an A-rating, above the average for the mining sector, in the assessment of CDP - an international non-profit organization that brings together 13,000 companies in 90 countries and represents more than 590 investors with assets from order of USD 110 trillion.

Vale has a historic commitment to fighting climate change and for almost 20 years has voluntarily published its emissions inventory and advances in the climate change agenda. In 2019, Vale updated its emission reduction commitments, based on the requirements of the Science Based Targets Initiative (SBTi), formally submitting them to the institution's validation. The company's net zero goal, which encompasses scopes 1 and 2, is technically in line with SBTi guidelines and only assumes emission reduction initiatives – it does not consider offsetting.

The company was one of the first to establish a quantitative scope 3 emission reduction target, also based on the SBTi requirements, with the only difference of allowing marginal use of offsets for the scope 3 target due to the high emission reduction challenge in steel customers.

Vale has robust internal governance that supports the cultural and technological transformation required for the decarbonization of mining and its value chain, notably the steel industry. Last year, the company launched a new product on the market, the green briquette, which has the potential to reduce emissions by up to 10% in steel mills. To date, Vale has entered into partnerships to develop decarbonization solutions with customers that represent approximately 30% of the world's steel production and about 40% of the company's scope 3 carbon emissions. 

Climate Change

The use of Nature-Based Solutions to offset any possible residual emissions that cannot be abated through technological solutions is conditioned to advances in discussions on the implementation of a global carbon market, with predictable and reliable rules, based on discussions already started with the regulation of Article 6 of the Paris Agreement, during COP 26, in Glasgow. As explained at COP-26, however, Vale believes in the potential of Nature-Based Solutions to mitigate global warming.  Currently, the company helps to protect almost 1 million hectares of forests in the world, an area 11 times larger than that occupied by its operations, thus contributing to the protection of native fauna and flora species, mainly endemic and threatened with extinction.  In 2019, the company also announced a voluntary commitment to protect and restore an additional 500,000 hectares of forests by 2030. In two years, 6,000 hectares have already been recovered and partnerships have been signed to protect 115,000 hectares of forests in Brazil. 

Vale's purpose is to improve life and transform the future. Together.

Positioning on the Climate Corporate Responsibility Monitor report study .vale-esg-modelo-informacao-atualizacao-expansivel.v3 .cabeca { border: 1px solid #d3d3d3; cursor: pointer; } .vale-esg-modelo-informacao-atualizacao-expansivel.v3 .cabeca h2 { font-size: 1rem; line-height: 1.5rem; padding: 0 1.25rem 0 0; } .vale-esg-modelo-informacao-atualizacao-expansivel.v3 .cabeca h2::after { content: ''; position: absolute; height: .625rem; width: .625rem; right: 1.7rem; top: calc(50% - 0.3125rem); border-top: 2px solid #696969; border-left: 2px solid #696969; transform: rotate(225deg); transition: all .3s; } .vale-esg-modelo-informacao-atualizacao-expansivel.v3 .aberto.cabeca h2:after { transform: rotate(45deg); } .vale-esg-modelo-informacao-atualizacao-expansivel .corpo { border: 1px solid #d3d3d3; display: none; } .vale-esg-modelo-informacao-atualizacao-expansivel.v3 .aberto + .corpo { display: block; padding: 1.5625rem 1.5625rem 2.8125rem; } .vale-esg-modelo-informacao-atualizacao-expansivel.v3 .corpo:after { content: ''; display: block; clear: both; } .vale-esg-modelo-informacao-atualizacao-expansivel.v3 .aberto + .corpo > div { float: none; margin-top: .3125rem; } .vale-esg-modelo-informacao-atualizacao-expansivel.v3 .corpo p { font-size: 1rem; line-height: 2rem; } .vale-esg-modelo-informacao-atualizacao-expansivel.v3 .corpo .date { font-size: .875rem; line-height: 1rem; color: #aaa; } .vale-esg-modelo-informacao-atualizacao-expansivel.v3 .corpo .ir-para-conteudo { font-size: .875rem; line-height: 1.5; color: var(--verde-claro); text-decoration: underline; margin: 0; } .vale-esg-modelo-informacao-atualizacao-expansivel .conteudo a { color: var(--verde-claro) } @media screen and (min-width: 768px) { .vale-esg-modelo-informacao-atualizacao-expansivel.v3 .cabeca h2 { font-size: 1.5rem; } .vale-esg-modelo-informacao-atualizacao-expansivel.v3 .corpo .ir-para-conteudo { font-size: 1.125rem; } }
<p> <style type="text/css"><!--td {border: 1px solid #cccccc;}br {mso-data-placement:same-cell;}--> </style> </p> <p>​Vale thanks the New Climate Institute and Carbon Market Watch for publishing the Climate Corporate Responsibility Monitor report, which analyzes the climate change strategies of 25 large global corporations, and keeps the topic under discussion.&nbsp;</p> <p>Vale believes, however, that, for a future edition of the study, the authors could complement their analyses with qualification of the sectoral challenges of which the companies evaluated are part. Mining and steel are admittedly hard-to-abate sectors, whose decarbonization trajectory is marked by a high degree of uncertainty in technological routes and high decarbonization costs.</p> <p>Vale's decarbonization strategy is public and based on a global policy. Vale's annual climate change performance is evaluated by specialized institutions such as Sustainalytics, Climate Action 100+, RFC Ambrian, among others. The company even received an A-rating, above the average for the mining sector, in the assessment of CDP - an international non-profit organization that brings together 13,000 companies in 90 countries and represents more than 590 investors with assets from order of USD 110 trillion.</p> <p>Vale has a historic commitment to fighting climate change and for almost 20 years has voluntarily published its emissions inventory and advances in the climate change agenda. In 2019, Vale updated its emission reduction commitments, based on the requirements of the Science Based Targets Initiative (SBTi), formally submitting them to the institution's validation. The company's net zero goal, which encompasses scopes 1 and 2, is technically in line with SBTi guidelines and only assumes emission reduction initiatives – it does not consider offsetting.</p> <p>The company was one of the first to establish a quantitative scope 3 emission reduction target, also based on the SBTi requirements, with the only difference of allowing marginal use of offsets for the scope 3 target due to the high emission reduction challenge in steel customers.</p> <p>Vale has robust internal governance that supports the cultural and technological transformation required for the decarbonization of mining and its value chain, notably the steel industry. Last year, the company launched a new product on the market, the green briquette, which has the potential to reduce emissions by up to 10% in steel mills. To date, Vale has entered into partnerships to develop decarbonization solutions with customers that represent approximately 30% of the world's steel production and about 40% of the company's scope 3 carbon emissions.&nbsp;</p> <p>The use of Nature-Based Solutions to offset any possible residual emissions that cannot be abated through technological solutions is conditioned to advances in discussions on the implementation of a global carbon market, with predictable and reliable rules, based on discussions already started with the regulation of Article 6 of the Paris Agreement, during COP 26, in Glasgow. As explained at COP-26, however, Vale believes in the potential of Nature-Based Solutions to mitigate global warming.&nbsp; Currently, the company helps to protect almost 1 million hectares of forests in the world, an area 11 times larger than that occupied by its operations, thus contributing to the protection of native fauna and flora species, mainly endemic and threatened with extinction.&nbsp; In 2019, the company also announced a voluntary commitment to protect and restore an additional 500,000 hectares of forests by 2030. In two years, 6,000 hectares have already been recovered and partnerships have been signed to protect 115,000 hectares of forests in Brazil.&nbsp;</p> <p>Vale's purpose is to improve life and transform the future. Together.</p>

Control and Management of Dams

Elefante has its emercengy level 1 removed

26-1-22 18:00
go-to-the-content

Vale informs on the Area IX dam

13-1-22 18:30

​Based on a proactive and precautionary approach by its tailings and dams management system, Vale informs that it has temporarily upgraded to level 2 the emergency protocol of the Área IX dam, located at the Fábrica mine, in the municipality of Ouro Preto, MG. This measure became necessary after piezometric changes in the structure’s right abutment, associated with the heavy rains that hit the region, a situation that demands studies and corrective actions, already initiated by the company.

The Area IX dam is inactive and is included in Vale's Upstream Dam Decharacterization Program. Its current volume is about 640 thousand cubic meters. The structure had been under a level 1 emergency protocol since June 2020, which was started on a preventive basis, with studies to detail its characteristics and safety conditions. Vale informs that there is no permanent presence of people and no additional evacuation is necessary. The measure started today has no impact on the company’s production.


The structure’s current condition was reported to the authorities and to the audit of the Public Prosecutors’ Office of the State of Minas Gerais and continue to be monitored by Vale's specialized teams and by the respective Engineer of Record. Vale maintains the continuous management and monitoring of its dams and geotechnical structures.
 

Vale informs on the Elephant dike

13-1-22 18:25


​Vale informs that it has initiated the level 1 emergency protocol of the Elefante dike, located at the Água Limpa mine, in the municipality of Rio Piracicaba, MG. This measure became necessary after erosion on the structure’s right abutment, associated with the heavy rains that hit the region, a situation that demands corrective actions, already initiated by the company. The Elefante dike serves to contain sediments and is being decharacterized. Its construction was carried out using the single-step method and its current sediment volume is around 200 thousand cubic meters.


Vale emphasizes that the Elefante dike’s overall stability was not compromised and that there is no permanent presence of people in the corresponding Self-Rescue Zone. There are also no impacts on the company's production. The anomaly was reported to the authorities and to the audit of the Public Prosecutors’ Office of the State of Minas Gerais and continue to be monitored by Vale's specialized teams and by the respective Engineer of Record. Vale maintains the continuous management and monitoring of its dams and geotechnical structures.
 

Vale announces the sale of its coal assets

21-12-21 9:00
go-to-the-content

Control and Management of Dams

Marés I dam had its emergency level 1 removed

15-12-21 13:00
go-to-the-content

Control and Management of Dams

Forquilha IV Dam (Ouro Preto) has the emergency level removed and Norte Laranjeiras (Barão de Cocais) has reduction in the level

30-11-21 19:10

Vale informs Forquilha IV Dam, from Mina Fábrica, in Ouro Preto (MG), has it emergency level 1 finished, on this Tuesday (30). In Barão de Cocais, the Norte Laranjeiras dam has it emergency level reduced from 2 to 1. The changes attest the safety increase and the structures stability and reinforce Vale’s commitment to the safety of the people that live close to the sites.

Forquilha IV dam underwent several improvements this year, such as adaptation of accesses, erosion correction and vegetation pruning. The actions were done using unmanned equipment, as the access to the dam is restricted, according to Labor Public Ministry (MPT) requirement. The structure has positive DCE.

Norte Laranjeiras dam also received a serie of actions and investigations in the last months and, based on the positioning of the Engineer of Record (EoR), company designers and technical staff, was concluded that the anomalia (crack) that preventively resulted in the increase to level 2 of the structure, in November 2020, does not affect the overall stability of the structure. Monitoring, safety controls and constant inspections at the dam reinforce this understanding.

The removal of the emergency level of the Forquilha IV dam and the reduction of the emergency level of Norte Laranjeiras were duly informed to competent authorities, according to guidelines established in the Emergency Action Plan for Mining Dams (PAEBM) and in Brazilian legislation, including the Brazilian National Mining Agency (ANM) and the technical audit of the Minas Gerais Public Prosecutor's Office (MPMG).

Forquilhas IV and Norte Laranjeiras dams, as all the other structures of the company, are monitored permanently by the Geotechnical Monitoring Center (CMG) and receive regular inspections from internal and external staff. Vale continues committed to meeting the best international engineering practices, always focusing on the security of the workers and the community close to the structures.

go-to-the-content

De-characterization plan

Vale concludes the elimination of the seventh upstream dam

29-11-21 13:20

​Conclusion of the works on dike 5, in Itabira (MG), represents an advance in the company’s commitment to eliminate every upstream dams it has in the country.

The decharacterization works in dike 5 of Pontal dam, in Itabira (MG), are concluded. The structure lost its upstream characteristics and does not store tailings anymore. The work was done with the adoption of rigorous Covid-19 prevention protocols. 


Since 2019, Vale already eliminated seven upstream dams in the country. The most recent, in July, was Fernandinho dam, in Nova Lima, in Belo Horizonte Metropolitan Region. In total, four structures in Minas Gerais e three in Pará were already decharacterizated and reintegrated in the environment.


Other 23 structures, all of them in Minas Gerais, will have their upstream characteristics eliminated. The projects are in action and are monitored by the regulators, Ministério Público and independent technical audits. Vale reinforces its commitment of eliminate all the upstream dams in the country, assumed in 2019, in the lower term possible, prioritizing people’s and environment’s safety.



The work conclusion of dike 5 represents an advance in the Decharacterization Program and in Vale’s commitment with a more transparent and safe management of its dams. The Decharacterization Program schedule and other information about the management of Vale’s dams are available and are regularly updated at www.vale.com/esg.

 

go-to-the-content

Atmospheric Emissions

Vale discloses targets for SOx, NOx and Particulate Matter reduction

29-10-21 18:00
go-to-the-content
Er trad een fout op.

Climate Change

Vale publishes the first report on climate changes in line with the recommendations of the Task Force on Climate Related Financial Disclosures

26-10-21 11:00

Vale released its first report on climate changes, an initiative that reinforces the strategic importance of the subject to the company. The purpose of the document, which will be published annually, is to map the exposure of Vale's assets to climate change risks, in line with the guidelines of the Task Force on Climate-Related Financial Disclosures (TFCD) and present the resilience of the company's business strategy before climate change scenarios.
 

go-to-the-content
Er trad een fout op.
div class="cabeca position-relative bg-branco px-4">

Control and Management of Dams

Update of Stability Condition Declarations - Dique 2, PDE 3, Dique de Pedra and Forquilhas IV
3-9-21 22:00

​Within the continuous performance assessment process executed by the respective Engineers of Records (“EoR”), the small-sized geotechnical structures Dique 2, PDE 3 and Dique de Pedra were issued with a negative Stability Condition Declaration (“DCE”). This classification refers to the adoption of a more robust tailings and dam management system, jointly with a conservative approach. Additionally, the Forquilha IV dam had negative DCE replaced by positive DCE.

  • Dique 2: sediments storage facility, with a center-line heightening, located in the municipality of Barão de Cocais (MG), at the Gongo Soco mine, with a volume of 15.412 m³. Given the proximity of the Sul Superior dam and the need to complement information on the structure, a conservative approach was taken in issuing the DCE. No anomaly or any other situation that could potentially compromise the dike's safety was identified.
     
  • PDE 3 dike: sediments storage facility, built in single-step rockfill, located in the municipality of São Gonçalo do Rio Abaixo (MG), at the Brucutu mine, with a volume of 43.000 m³. During the “As Is” project preparation stage, new information on the geological-geotechnical conditions of the foundation was incorporated, which in turn requires additional information. From this reassessment, obtained so far in the “As Is” project, a safety factor slightly below the limit was identified for one of the sections. No anomaly or any other situation that implies a deterioration in the state of conservation was identified.
     
  • Dique de Pedra: auxiliary and temporary tailings storage facility, built in a single step, located in the municipality of Ouro Preto (MG), in the Fábrica mine, with a volume of 500,000 m³. The Dique de Pedra structure was recorded in the systems of the National Mining Agency ("ANM") and the State Foundation for the Environment ("FEAM") of Minas Gerais after a precision topographic survey, which changed its characterization. Despite having been conceived as a temporary structure associated with the Forquilha IV dam, the structure is now treated as an independent dam in relation to the existing dam downstream. Given the absence of geotechnical information on the structure and its conception as a temporary structure, a conservative scenario was preventively adopted, assuming that it does not meet the safety requirements.


Vale will establish complementary studies and additional safety measures for these structures, in line with its conservative approach to risk management. In this sense, the emergency protocol at level 1, which does not require the evacuation of the Self-Rescue Zones downstream of the structures, was activated for PDE 3 and Dique de Pedra structures, as per the respective Emergency Action Plans for Mining Dams ("PAEBM”).

The Forquilha IV dam received a positive DCE, due to the increase in its safety factors and the improvement of its conservation status, after having a negative DCE since October 2019. The tailings containment structure, built by the center-line method, is located in the municipality of Ouro Preto (MG), at the Fábrica mine. The improvement in its conditions results from the adoption of measures to resolve anomalies, carried out with unmanned equipment, including the correction of erosions on slopes and in the vicinity of the peripheral channel, correction and adequacy of access to the left abutment and desilting of the bottom drain. The removal of the level 1 emergency protocol, which is active for the structure today, will be evaluated in due course, considering that Forquilha IV is located downstream of emergency level 2 dams.

Vale now has 110 structures included in the National Dam Safety Policy (“PNSB”), of which 31 have negative DCEs, with 31 structures at some level of emergency. In the four cases above, the update does not have a material impact on Vale's operations. The company reiterates that its priority is the safety of people and communities downstream of its operations, as well as the safety of all its structures.
 

go-to-the-content
Er trad een fout op.
Er trad een fout op.

Control and Management of Dams

Reduction of Sul Inferior dam’s emergency level

18-6-21 19:00

​The Sul Inferior dam, at the Gongo Soco mine, in Ouro Preto (MG), had its emergency level reduced from 2 to 1, on June 18, 2021. The change, which reflects the increased safety and stability of the structure, is a result of a series of corrective works on the structure's slope, carried out by Vale in recent months. The improvements were monitored and certified by the technical consulting firm in charge.
The reduction in the level of emergency was filed with the competent bodies, according to guidelines established in the Emergency Action Plan for Mining Dams (PAEBM) and by the Brazilian legislation, and reported to the National Mining Agency (ANM) and to the technical audit supporting the Minas Gerais Public Prosecutor’s Office (MPMG).
Despite the increased safety, the families evacuated from the Sul Inferior dam’s Self-Rescue Zone (ZAS) will remain preventively relocated until the completion of the de-characterization process of the Sul Superior dam, located nearby.
Sul Inferior is a water and sediment containment dam, built in a single step, considered one of the safest construction methods. It is monitored 24 hours a day by the Geotechnical Monitoring Center (CMG) and is regularly inspected by internal and external teams. Vale will continue to carry out maintenance and adjustment activities so that the indicators follow the most conservative parameters established by specialized technical consultants, focusing on the safety of the people who work and live in the surroundings of the structure.
 

go-to-the-content
class="vale-esg-modelo-informacao-atualizacao-expansivel v3 center" id="informacao-atualizacao-expansivel-goxp_"> div class="cabeca position-relative bg-branco px-4">

Ethics and Transparency

Vale discloses its 2020 Tax Transparency Report

31.5.2021 17:00

​Vale released today the second edition of its Tax Transparency Report that sets out the company’s approach to tax – one that is rooted in compliance, transparency, a long-term view, risk management and positive relationships with tax authorities. We also share details of how Vale has supported our communities, partners and our staff through the COVID-19 pandemic.
It builds on our first publication last year by sharing more information on how, when and why we pay tax – and includes details of our greater economic contribution in the society.
This report details taxes and royalties paid in Brazil, where most of the operations are located, and worldwide for all government spheres, and by project, highlighting the jurisdictions that we operate.
The report is an important part of our new pact with society as we look to better engage our stakeholders in the places we work.
In 2020, Vale paid US$ 5.7 billion in taxes and royalties, out of which U$$ 4.9 billion (86%) — was paid in Brazil.

 

go-to-the-content
Er trad een fout op.
Er trad een fout op.

Sustainability

Vale launches its first Integrated Report, with the results of the management of material topics, updated in 2020 after consultation with its main stakeholders

15-4-21 20:00

​In 2021, the Integrated Report was launched replacing the Sustainability Report. With a more concise approach and greater focus on the ESG strategy, the document was prepared according to the guidelines of the International Integrated Reporting Council (IIRC), in addition to the Global Reporting Initiative (GRI) Standards.
 

go-to-the-content

Dam Performance

Vale discloses a list of summarized EoR assessments of Vale’s dams, dikes and drained piles, covered by the National Dam Safety Policy

Governance

Call Notice for Annual and Extraordinary General Meetings

Er trad een fout op.

Control and Management of Dams

Vale informs on the Norte/Laranjeiras dam

9-2-21 15:00

Due to the updating of information regarding the Norte / Laranjeiras dam, of the Brucutu mine, in the municipality of Barão de Cocais, MG, the Self-Rescue Zone (ZAS) related to the structure was expanded on February 9, 2021. Under the coordination of the Civil Defense and in collaboration with other competent authorities and Vale, in the next few days, the scheduled removal of residents in the area corresponding to the expansion of the ZAS will begin, respecting the health and safety protocols recommended during the COVID-19 pandemic. The company will provide shelter and all necessary assistance to the families until the situation is normalized. The company reinforces that the ZAS originally identified for the structure already had a previous removal process completed.



The company also informs that there are no changes in the safety conditions of the structure. The updating of information regarding the scenarios of dam failure is in line with the conservative approach to risk management and in compliance with the provisions of the Term of Commitment signed between the State of Minas Gerais, the Public Prosecutors' Office of Minas Gerais and Vale, which defined new parameters for updating flood spots. The Norte/Laranjeiras dam has no longer received tailings and has ongoing works for safety and stability conditions improvement. The company reiterates that its priority is the safety of people and communities downstream of its operations, as well as the safety of all its structures.

 

Er trad een fout op.
Er trad een fout op.
Er trad een fout op.

Policies and Corporate Documents

Vale discloses its water and water resources policy

23-11-20 0:00
go-to-the-content

Control and Management of Dams

Vale informs on the Norte/Laranjeiras dam

18.11.2020 11:00

Control and Management of Dams

​Vale informs that today it started, on a preventive basis, the Level 2 emergency protocol for the Norte/Laranjeiras dam, of the Brucutu mine, in the municipality of Barão de Cocais, MG.
 

go-to-the-content
$(function(){ const templateElement = document.querySelector('#informacao-atualizacao-expansivel-uoel_ > .cabeca'); templateElement.addEventListener('click', abrirElemento); function abrirElemento() { if (templateElement.classList.contains('aberto')) { templateElement.classList.remove('aberto'); } else { templateElement.classList.add('aberto'); } } // abrir card de acordo com parâmetro da URL const param = 'updtTitle'; const url = new URL(window.location.href); const updtTitle = url.searchParams.get(param); const tituloCard = "Vale informs on the Norte/Laranjeiras dam"; if (tituloCard && tituloCard === updtTitle) { abrirElemento(); deslizarAteCard(); } function deslizarAteCard(){ const headerOffset = 80; const elementPosition = templateElement.getBoundingClientRect().top; const offsetPosition = elementPosition + window.pageYOffset - headerOffset; window.scrollTo({ top: offsetPosition, behavior: "smooth" }); } }); go-to-the-content

Our Strategy and Commitments

Our Strategy and Commitments

Vale updates its action plan to close the ESG gaps

9-10-20 15:00
go-to-the-content

.vale-esg-modelo-informacao-atualizacao-expansivel.v3 .cabeca { border: 1px solid #d3d3d3; cursor: pointer; } .vale-esg-modelo-informacao-atualizacao-expansivel.v3 .cabeca h2 { font-size: 1rem; line-height: 1.5rem; padding: 0 1.25rem 0 0; } .vale-esg-modelo-informacao-atualizacao-expansivel.v3 .cabeca h2::after { content: ''; position: absolute; height: .625rem; width: .625rem; right: 1.7rem; top: calc(50% - 0.3125rem); border-top: 2px solid #696969; border-left: 2px solid #696969; transform: rotate(225deg); transition: all .3s; } .vale-esg-modelo-informacao-atualizacao-expansivel.v3 .aberto.cabeca h2:after { transform: rotate(45deg); } .vale-esg-modelo-informacao-atualizacao-expansivel .corpo { border: 1px solid #d3d3d3; display: none; } .vale-esg-modelo-informacao-atualizacao-expansivel.v3 .aberto + .corpo { display: block; padding: 1.5625rem 1.5625rem 2.8125rem; } .vale-esg-modelo-informacao-atualizacao-expansivel.v3 .corpo:after { content: ''; display: block; clear: both; } .vale-esg-modelo-informacao-atualizacao-expansivel.v3 .aberto + .corpo > div { float: none; margin-top: .3125rem; } .vale-esg-modelo-informacao-atualizacao-expansivel.v3 .corpo p { font-size: 1rem; line-height: 2rem; } .vale-esg-modelo-informacao-atualizacao-expansivel.v3 .corpo .date { font-size: .875rem; line-height: 1rem; color: #aaa; } .vale-esg-modelo-informacao-atualizacao-expansivel.v3 .corpo .ir-para-conteudo { font-size: .875rem; line-height: 1.5; color: var(--verde-claro); text-decoration: underline; margin: 0; } .vale-esg-modelo-informacao-atualizacao-expansivel .conteudo a { color: var(--verde-claro) } @media screen and (min-width: 768px) { .vale-esg-modelo-informacao-atualizacao-expansivel.v3 .cabeca h2 { font-size: 1.5rem; } .vale-esg-modelo-informacao-atualizacao-expansivel.v3 .corpo .ir-para-conteudo { font-size: 1.125rem; } }

Vale updates its action plan to close the ESG gaps </h2> </div> <div class="corpo bg-branco"> <div class="date"> 9.10.2020 15:00 </div> <div class="pb-2 mb-md-1"> </div> <a class="ir-para-conteudo" target="_blank" href="/web/esg/our-strategy-and-commitments"> go-to-the-content </a> </div> </div> <style> .vale-esg-modelo-informacao-atualizacao-expansivel.v3 .cabeca { border: 1px solid #d3d3d3; cursor: pointer; } .vale-esg-modelo-informacao-atualizacao-expansivel.v3 .cabeca h2 { font-size: 1rem; line-height: 1.5rem; padding: 0 1.25rem 0 0; } .vale-esg-modelo-informacao-atualizacao-expansivel.v3 .cabeca h2::after { content: ''; position: absolute; height: .625rem; width: .625rem; right: 1.7rem; top: calc(50% - 0.3125rem); border-top: 2px solid #696969; border-left: 2px solid #696969; transform: rotate(225deg); transition: all .3s; } .vale-esg-modelo-informacao-atualizacao-expansivel.v3 .aberto.cabeca h2:after { transform: rotate(45deg); } .vale-esg-modelo-informacao-atualizacao-expansivel .corpo { border: 1px solid #d3d3d3; display: none; } .vale-esg-modelo-informacao-atualizacao-expansivel.v3 .aberto + .corpo { display: block; padding: 1.5625rem 1.5625rem 2.8125rem; } .vale-esg-modelo-informacao-atualizacao-expansivel.v3 .corpo:after { content: ''; display: block; clear: both; } .vale-esg-modelo-informacao-atualizacao-expansivel.v3 .aberto + .corpo > div { float: none; margin-top: .3125rem; } .vale-esg-modelo-informacao-atualizacao-expansivel.v3 .corpo p { font-size: 1rem; line-height: 2rem; } .vale-esg-modelo-informacao-atualizacao-expansivel.v3 .corpo .date { font-size: .875rem; line-height: 1rem; color: #aaa; } .vale-esg-modelo-informacao-atualizacao-expansivel.v3 .corpo .ir-para-conteudo { font-size: .875rem; line-height: 1.5; color: var(--verde-claro); text-decoration: underline; margin: 0; } .vale-esg-modelo-informacao-atualizacao-expansivel .conteudo a { color: var(--verde-claro) } @media screen and (min-width: 768px) { .vale-esg-modelo-informacao-atualizacao-expansivel.v3 .cabeca h2 { font-size: 1.5rem; } .vale-esg-modelo-informacao-atualizacao-expansivel.v3 .corpo .ir-para-conteudo { font-size: 1.125rem; } } </style> <script> $(function(){ const templateElement = document.querySelector('#informacao-atualizacao-expansivel-ctkx_ > .cabeca'); templateElement.addEventListener('click', abrirElemento); function abrirElemento() { if (templateElement.classList.contains('aberto')) { templateElement.classList.remove('aberto'); } else { templateElement.classList.add('aberto'); } } // abrir card de acordo com parâmetro da URL const param = 'updtTitle'; const url = new URL(window.location.href); const updtTitle = url.searchParams.get(param); const tituloCard = "Vale updates its action plan to close the ESG gaps"; if (tituloCard && tituloCard === updtTitle) { abrirElemento(); deslizarAteCard(); } function deslizarAteCard(){ const headerOffset = 80; const elementPosition = templateElement.getBoundingClientRect().top; const offsetPosition = elementPosition + window.pageYOffset - headerOffset; window.scrollTo({ top: offsetPosition, behavior: "smooth" }); } }); </script>

Control and Management of Dams

Forquilha I dam emergency level reduced to level 2

8-10-20 18:25
go-to-the-content
Er trad een fout op.

Performance

Vale updates its environmental compliance section with information on fines and environmental incidents

5-10-20 14:00
go-to-the-content

Control and Management of Dams

Vale updates the de-characterization timeline of its geotechnical structures

16-9-20 9:30
go-to-the-content

PTVI refrains from making comments on the discretionary actions of the Police and regulatory bodies and affirms our commitment to legal adherence and ethical conduct, reporting instances of violence and vandalism involving PTVI's employees, contractors, and assets in accordance with its commitment to provide a safe and healthy workplace. . Our approach to conflict resolution prioritizes open dialogue involving the community, village, sub-district, district governments, and other stakeholders. These engagements are carried out with strict observance of the existing legal framework. PTVI’s dedication to the well-being of the community is reflected in our Code of Conduct (CoC) and Human Rights Policy. In line with these commitments, all PTVI security personnel, including contractors, have undergone human rights training.

During a protest in 2023, PTVI found that the protest escalated into vandalism. To avoid potential further escalations or a hostile situation developing, PTVI reported the situation to the authorities, deferring the enforcement to them, as per applicable law. While PTVI cannot comment on police discretion, PTVI's commitment to dialogue is unwavering whilst upholding our obligation to report incidents and prioritize peaceful resolution, fostering a safe and inclusive environment. Our commitment to community safety and respecting and promoting Human Rights is again prescribed in our CoC and Human Rights Policy.

PTVI reaffirms our commitment to open dialogue with civil society, to promotion of community welfare, and to abiding by the highest ESG standards.

Engagement through open dialogue is a cornerstone of PTVI's approach, and we actively prioritize interactions with the local community, village leadership, sub-district and district governments, as well as other relevant stakeholders. It is crucial to note that PTVI's influence does not extend to military actions. We respect military jurisdiction and are committed to safeguarding and upholding human rights within our operations. Inquiries or concerns pertaining to military conduct should be directed to the appropriate governing bodies in Indonesia.

<div class="cabeca position-relative bg-branco px-4"> <div class="mt-6 mb-2"> <p class="m-0"> Biodiversity </p>

Learn more about Vale's actions to help protect the Amazon ​Vale has been in the Amazon for more than 30 years helping to protect approximately 800 thousand hectares of rainforest in partnership with Brazil’s ICMBio. 


 

go-to-the-content
16-9-20 8:00
$(function(){ const templateElement = document.querySelector('#informacao-atualizacao-expansivel-houz_ > .cabeca'); templateElement.addEventListener('click', abrirElemento); function abrirElemento() { if (templateElement.classList.contains('aberto')) { templateElement.classList.remove('aberto'); } else { templateElement.classList.add('aberto'); } } // abrir card de acordo com parâmetro da URL const param = 'updtTitle'; const url = new URL(window.location.href); const updtTitle = url.searchParams.get(param); const tituloCard = "Learn more about Vale's actions to help protect the Amazon"; if (tituloCard && tituloCard === updtTitle) { abrirElemento(); deslizarAteCard(); } function deslizarAteCard(){ const headerOffset = 80; const elementPosition = templateElement.getBoundingClientRect().top; const offsetPosition = elementPosition + window.pageYOffset - headerOffset; window.scrollTo({ top: offsetPosition, behavior: "smooth" }); } }); go-to-the-content

Climate Change

Vale is installing at Ilha Guaíba terminal (TIG), in Rio de Janeiro, one of the country's largest battery energy storage systems to supply electrical demand

15-9-20 23:00
go-to-the-content

Presentations

Vale updates its ESG Portal with a new section comprising presentations related to the ESG theme

14-9-20 17:00
go-to-the-content
Er trad een fout op.

Brumadinho

Vale updates timeline to address the recommendations presented in the final report from the Investigation Committee (CIAE-A)

11-9-20 11:00
go-to-the-content

Control and Management of Dams

Vale informs on Paracatu and Patrimônio dikes and Stability Condition Declarations

2-9-20 9:00

Vale informs that, in line with the continuous monitoring of the safety conditions of its geotechnical structures, and as a result of regular inspections and frequent interpretations of data related to the structures, performed through the function of the Engineer of Record (“EoR”), it started today, on a preventive basis, the Level 1 emergency protocol of the Paracatu and Patrimônio dikes, a protocol that does not require the evacuation of the population downstream of the structures.
 

go-to-the-content

Control and Management of Dams

Vale comments on new standard on tailings management

1-9-20 19:00
go-to-the-content

Impact to Communities

Vale updates its Grievance Mechanisms section with information on its management, channels, types of interactions and indicators' performance

14-8-20 10:00
go-to-the-content

Suppliers

Vale updates its Suppliers page with information about the Partilhar Program which aims to contribute to the socioeconomic development of the locations where the company operates

3-8-20 17:00
go-to-the-content

Ethics and Transparency

Vale updates its Ethics and Transparency page with its first annual Tax Transparency Report, as part of Vale's new pact with society and aligned with its ESG agenda

30-7-20 0:00

Vale informs that it has published today, its first annual Tax Transparency Report as part of our new pact with society and journey to better engage our stakeholders. 



In 2019, Vale paid US$ 4.5 billion in taxes and royalties globally, of which more than 90% (US$ 4.2 billion) were paid in Brazil, where most of our operations are carried out. The amount of US$ 4.5 billion in taxes and royalties paid in 2019 corresponds to more than 10% of Vale’s total economic contribution last year. In addition to tax payments, this contribution includes operational costs, salaries and employee benefits, among others. 


The report sets out the principles behind Vale’s approach to tax and investment. It includes information about corporate income taxes, tax on mining, payroll taxes, tax on products and services and other taxes, providing data on the taxes paid in Brazil, Canada, Indonesia, Mozambique and New Caledonia. 


With this publication, Vale meets with one year in advance its commitment to deliver a detailed tax transparency report as part of its ESG agenda. According to an action plan to fulfil Vale’s ESG reporting commitment, the report was originally scheduled to be published in 2021.


The disclosure of the Tax Transparency report demonstrates Vale’s commitment to transparency as it follows the principles recommended by international entities such as the International Council on Mining and Metals (ICMM) and the Extractive Industries Transparency Initiative (EITI). 
 

go-to-the-content

Control and Management of Dams

Vale informs on Barragem 5

29-7-20 10:00

​Vale informs that today it started, on a preventive basis, the Level 1 emergency protocol for Barragem 5, at Mina da Mutuca, Nova Lima (Minas Gerais), a protocol that does not require the evacuation of the population downstream of the dam. This tailings dam was built with compacted soil, with a downstream construction method and no longer receives mining tailings.This protocol is a preventive measure.

 

go-to-the-content
Er trad een fout op.
Er trad een fout op.
15-7-20 0:00
go-to-the-content
Er trad een fout op.
Er trad een fout op.
Er trad een fout op.
Er trad een fout op.

Board of Directors and Leadership

Vale updates the profile of its Board of Directors and includes information regarding the Audit Committee

28-6-20 18:00

Vale updated about its Board and Leadership page with information on the Board of Directors' members, assessment processes, among others. Besides that, the page contains uptades about Vale's Committees, including the Audit Committee established in March 2020.

 

go-to-the-content

Compensation

Vale brings analysis and discussion on executive compensation and 2019 and 2020 annual bonus panel

28-6-20 8:00

Vale updates its Compensation page with an analysis and discussion on the compensation of its executives and informations regarding the 2019 e 2020 annual bonus panel.
 

go-to-the-content
Er trad een fout op.

Climate Change

Health and Safety

Vale invests in humanitarian aid to tackle COVID-19 in the countries where its operates

>
11-5-20 13:10

The total amount so far invested in these countries exceeds USD 2,2 million for actions to tackle the spread of the virus and treat the disease.

Since the end of January, Vale has taken all measures required to support the prevention of COVID-19 in its operations and to contribute to the regions in which it operates. Globally, the company complies with the health and safety protocols established by the authorities and agencies of each country and aims to support government initiatives in order to alleviate the burden on health care systems. Among the initiatives are donations for the purchase of personal protective equipment (PPE), health care supplies, hygiene materials, rapid test kits, and the swab test for detecting the virus.

However, humanitarian actions are not limited to the acquisition of inputs. In Indonesia, isolation rooms for the intensive care of patients have been set up and equipped; it was an initiative by Vale Indonesia Tbk in support of the Government of the eastern region of Luwu and the Provincial Government of South Sulawesi. Aiming to help Chinese hospitals and their teams address the health challenge, Vale has donated RMB3.3 million to the Chinese Red Cross Foundation. In Canada, in response to Sudbury Food Bank's request for financial support, USD 100,000 was allocated to the Cash for Cans campaign, which sustains the growing demand for food during the pandemic. Aiming to support the Mozambican Government, a memorandum of support to tackle the disease was signed in addition to supplies amounting to almost USD 2,000,000.00 (two million US dollars). This aid includes several hygiene materials, hospital equipment, personal protection items for health care professionals, and 80,000 rapid tests. To contribute to the well-being of the communities in which it operates, Vale Malaysia Minerals (VMM) has donated 20,000 COVID-19 test kits to the Malaysian Ministry of Health, in addition to donations to Manjung – where the maritime terminal of Teluk Rubiah operates –, totaling RM 85,000.

The support for the countries in which Vale operates is continuous to containing the pandemic. The company has planned new donations for actions to tackle the spread of the virus and treat the disease.

These are the main humanitarian actions already taken, in each country, by Vale to tackle the COVID-19:

 

China

Action to support the Chinese Red Cross Foundation – RMB 3.3 million

  •     Purchase of health care supplies, including protective clothing, masks, goggles, and other required materials.

Canada 

Action to support the Sudbury Food Bank – USD 100,000

  •     Donation to the Cash for Cans campaign, which is designed to meet the demand for food during the pandemic. Sudbury Food Bank is a central food distributor for 44 food banks and meal suppliers across Greater Sudbury. Currently, these agencies support 8,500 people per month, and this number is expected to grow due to the COVID-19 pandemic.

Other Actions

Vale has launched the COVID-19 Challenge, which will provide USD 1,000,000 to develop solutions against the disease, including risk monitoring and prevention as well as patient monitoring. Also, there is an Open Challenge category, which covers other topics. Companies, startups, institutions, government, universities, and professionals have been invited to participate.

Mozambique

Actions to support the Mozambican Government – USD 2,000,000.00

  •     Hygiene materials, hospital equipment, and personal protective items for health care professionals.
  •     Donation of 80 thousand rapid tests.
  •     Donation of PPE for the Health area, such as gloves, masks, goggles, boots, safety overalls, and aprons.
  •     Donation of hygiene material, including electric sprayers, alcohol for disinfection, and soap bars. 
  •     Provision of hospital equipment, such as infusion pumps, sample collection kits, aspirators, and defibrillators.

Other Actions

  •     Creation of a 24-hour helpline number designed to share daily information about COVID-19, additionally to the Internal Communication channels, with direct and third-party employees.

Indonesia

Actions to support the Government of the eastern region of Luwu    

 

  • Donation of 10 hospital beds, disinfectant liquid, thermal guns, protective clothing, surgical masks, N95 masks, and rubber gloves. 
  •     Donation of 13 hospital beds for isolation rooms at the Burau Community Health Center, two ventilation units for Hospital I Lagaligo, and 13 thermal guns to be used in six control stations under the supervision of GTPP COVID-19 at the eastern region of Luwu.

Actions to support the Provincial Government of South Sulawesi

Donation of 800 N95 masks, 800 surgical masks, 200 rubber gloves, and 100 units of protective clothing for medical teams through the GTPP COVID-19 at South Sulawesi. Donation of an ambulance for a one-year operational period and 1,000 units of personal protective equipment (PPE), such as rubber gloves, for the Wahidin Sudirohusodo Hospital. 

Other Actions

Vale Indonesia Tbk is conducting mass-scale COVID-19 testing among all employees and service providers in its operational areas of Sorowako, East Luwu Regency, and South Sulawesi. It also plans to progressively cover all 3,000 direct employees and almost 7,000 third-party employees. The planning is expected to test almost 500 people every day. At the same time, rapid tests are also being carried out at Bahodopi (Central Sulawesi) and Pomalaa (South Sulawesi).

Malaysia

Actions to support the Government and Ministry of Health of Malaysia – RM 85,000

  •     Donation of 20,000 COVID-19 test kits.
  •     Donation of RM 25,000 for supplies to the Manjung District and Land Office aiming the creation of new COVID-19 screening centers.
  •     Donation of RM 55,000 for the purchase of eight Powered Air Purifying Respirators (PAPRs) to support the health care at the Manjung Hospital.
  •     Donation of RM 5,000 for thermometers and PPE to Manjung immigration officers, who are on the frontlines, supporting the fight against the spread of COVID-19.

 

Er trad een fout op.
Er trad een fout op.
Er trad een fout op.
Er trad een fout op.

​Vale is updating its Sustainability Policy aiming to contemplate our new commitments to society and our new strategy to achieve our mission: to transform natural resources into prosperity and sustainable development.​Vale is updating its Sustainability Policy aiming to contemplate our new commitments to society and our new strategy to achieve our mission: to transform natural resources into prosperity and sustainable development. �​Vale is updating its Sustainability Policy aiming to contemplate our new commitments to society and our new strategy to achieve our mission: to transform natural resources into prosperity and sustainable development.​Vale is updating its Sustainability Policy aiming to contemplate our new commitments to society and our new strategy to achieve our mission: to transform natural resources into prosperity and sustainable development. �/p>

ou can contribute by reading the current version of Vale's Sustainability Policy and answering the following questions. The process takes approximately 10 minutes.

go-to-the-content $(function(){ const templateElement = document.querySelector('#informacao-atualizacao-expansivel-tbqs_ > .cabeca'); templateElement.addEventListener('click', abrirElemento); function abrirElemento() { if (templateElement.classList.contains('aberto')) { templateElement.classList.remove('aberto'); } else { templateElement.classList.add('aberto'); } } // abrir card de acordo com parâmetro da URL const param = 'updtTitle'; const url = new URL(window.location.href); const updtTitle = url.searchParams.get(param); const tituloCard = "Take part in the public consultation to review Vale's Sustainability Policy"; if (tituloCard && tituloCard === updtTitle) { abrirElemento(); deslizarAteCard(); } function deslizarAteCard(){ const headerOffset = 80; const elementPosition = templateElement.getBoundingClientRect().top; const offsetPosition = elementPosition + window.pageYOffset - headerOffset; window.scrollTo({ top: offsetPosition, behavior: "smooth" }); } });
20/04/22 13:00
Er trad een fout op.
Er trad een fout op.
Er trad een fout op.
Governance

Vale Announces Alternative Measures for Holding its Meeting of Shareholders on 04/30/2020

30-3-20 13:00

​Vale has been following the evolution of the coronavirus outbreak (Covid-19) in Brazil and aiming to preserve the integrity of its employees, service providers and shareholders at the Annual Extraordinary and General Meetings’ (“AGM/E”), which will be held, cumulatively, on April 30th, 2020, the Company encourages the remote participation of shareholders as an option for in-person participation.

go-to-the-content

People and Community

Coronavirus: Vale Informs on the Efforts Adopted to Minimize Risk of Contagion Among Employees and Communities

27-3-20 17:00

​Since the end of January, Vale has been taking all possible efforts to prevent COVID-19. The company's actions resulting from the pandemic are being managed by a structure of regional and executive committees, created especially to ensure the safety of all. Globally, the company complies with the health and safety protocols established by the authorities and agencies of each country and the actions determined by the internal pandemic preparedness and response plan and closely monitors the development of the situation. Some of our actions:

 

  • T
Er trad een fout op.

People and Community

Vale Brings 5 Million Test Kits and Medical Supplies to Brazil, in Humanitarian Aid

24-3-20 10:10

Vale has closed the purchase of 5 million new coronavirus (Covid-19) rapid test kits to help the Brazilian government combat the spread of the illness in the country. 

go-to-the-content
Er trad een fout op.
Er trad een fout op.
Er trad een fout op.
Er trad een fout op.

Brumadinho

Report from Support and Reparation Committee

3-3-20 0:00

​Final report prepared by the Extraordinary Independent Consulting Committee for Support and Reparation was released with recommendations and monitoring of action plans related to the Brumadinho event.

go-to-the-content

Investors

Support on MV Stellar Banner Vessel

28-2-20 0:00

​Vale is committed with all efforts and resources to mitigate the possible impacts related to the incident with the MV Stellar Banner vessel, owned and operated by the South Korean.

go-to-the-content
div class="vale-esg-modelo-informacao-atualizacao-expansivel v3 center" id="informacao-atualizacao-expansivel-jjkz_">

Brumadinho

Report from Investigation Committee

Brumadinho

div class="cabeca position-relative bg-branco px-4">

Report from Investigation Committee

20/02/20 0:00

​The summary of the report prepared by the Extraordinary Independent Consulting Committee for Investigation for Investigation was released with recommendations of a technical and governance nature.

go-to-the-content
Er trad een fout op.

Reparation

Expert Panel Report

11-12-19 0:00

​The Expert Panel assessment of the technical causes of the failure of Dam I at the Córrego do Feijão Mine in Brumadinho is available.

go-to-the-content

Our Strategy and Commitments

ESG Gaps Action Plan

2-12-19 1:00

​Vale is announcing new commitments for 2030 and, in addition, mapped its GAPs in ESG and brought them together in an Action Plan for monitoring and alignment with best practices. Check out the action plan.

go-to-the-content