Control and Management of Dams - ESG
Control and Management of Dams
An example of these ongoing efforts is the creation, since 2019, of three Geotechnical Monitoring Centers (CMG), which monitor the dams 24/7 to ensure useful information for better decision making.
Emergency Management
In the Ferrous business, Vale's integrated risk management system for geotechnical structures is based on three main pillars:
Teams specialized in dam control and management are dedicated to Vale's structures.
Reassessment of safety, risk and emergency management procedures throughout the structure cycle, from project implementation to operation. In all phases, a risk prognosis is made, and a state of alert is established in case of an emergency. The safety policy for dams and geotechnical mining structures, established in October 2020, and Vale's normative standard for business risk management, revised in December 2020, guide this work.
Information Systems
There are two systems in the Ferrous business:
1) Geotechnical: stores structural maintenance and monitoring data;
2) GRG: stores technical data of the structures and the Dam Safety Plan (PSB).
Dams emergency levels:
Emergency situations are considered those arising from adverse events that affect the dam safety and may cause damage to its structural and operational integrity, preservation of life, health, property and environment. The emergency should be assessed and classified according to the levels below:When an anomaly is detected that results in the maximum score for the state of conservation or for any other situation with a potential compromise in the safety of the structure, requiring special daily inspections.
Comunication to:
the Brazilian National Mining Agency (ANM), environmental agencies and Civil Defense (national, state and municipal).
Vale’s structures
Immediate actions: signaling instability and intensifying monitoring.
Dams: 5-Mutuca, 6, 7A, B, Campo Grande, Dicão Leste, Doutor, Maravilhas II, Norte/Laranjeiras, PDE 3, Peneirinha, Pontal, Vargem Grande.
When the result of the actions taken in the anomaly referred to in Level 1 is classified as “uncontrolled” or “not extinguished”, requiring new special inspections and interventions.
Comunication to:
the ANM, environmental agencies, Civil Defense (national, state and municipal), Self-Rescue Zone (ZAS) and Secondary Safety Zone (ZSS)
Vale’s structures
Immediate actions: from that level, people in the ZAS are evacuated.
Dams: B3/B4, Dique de Pedra, Forquilha I, Forquilha II, Grupo, Xingu.
Situation of imminent or ongoing rupture.
Comunication to:
the ANM, environmental agencies, Civil Defense (national, state and municipal), ZAS and ZSS.
Vale’s structures
Immediate actions: Care is extended to people who are in the ZSS through additional educational measures.
Dams: B3/B4, Forquilha III, Sul Superior.
Level of Emergency
|
Detailment
|
Comunication to
|
Vale’s structures
|
|
---|---|---|---|---|
|
|
the Brazilian National Mining Agency (ANM), environmental agencies and Civil Defense (national, state and municipal).
|
Immediate actions: signaling instability and intensifying monitoring. |
|
|
When the result of the actions taken in the anomaly referred to in Level 1 is classified as “uncontrolled” or “not extinguished”, requiring new special inspections and interventions.
|
the ANM, environmental agencies, Civil Defense (national, state and municipal), Self-Rescue Zone (ZAS) and Secondary Safety Zone (ZSS)
|
Immediate actions: from that level, people in the ZAS are evacuated.
Dams: B3/B4, Dique de Pedra, Forquilha I, Forquilha II, Grupo, Xingu. |
|
|
Situation of imminent or ongoing rupture.
|
the ANM, environmental agencies, Civil Defense (national, state and municipal), ZAS and ZSS.
|
Immediate actions: Care is extended to people who are in the ZSS through additional educational measures.
Dams: Forquilha III, Sul Superior. |
- Quantity: -
- Structure: -
- Quantity: 21
- Structure: -
- Quantity: 2
- Structure: The dams Área IX and Capitão do Mato had their emergency levels closed.
Emergency Level updated on 04/06/2023
|
Quantity
|
Structure
|
---|---|---|
|
-
|
-
|
|
21
|
-
|
|
2
|
The dams Área IX and Capitão do Mato had their emergency levels closed.
|
List of structures at emergency level
Structures with downstream raising method
Iron Ore |
Operational Status |
Municipality |
Purpose |
DCE |
Emergency Level |
Emergency level date |
---|---|---|---|---|---|---|
B3/B4
|
Inactive
|
Nova Lima
|
Tailings
|
Negative
|
2
|
12/02/2022
|
Campo Grande
|
Inactive
|
Mariana
|
Tailings
|
Negative
|
1
|
04/01/2019
|
Doutor
|
Inactive
|
Ouro Preto
|
Tailings
|
Negative
|
1
|
05/18/2021
|
Forquilha I
|
Inactive
|
Ouro Preto
|
Tailings
|
Negative
|
2
|
10/08/2020
|
Forquilha II
|
Inactive
|
Ouro Preto
|
Tailings
|
Negative
|
2
|
02/20/2019
|
Forquilha III
|
Inactive
|
Ouro Preto
|
Tailings
|
Negative
|
3
|
03/27/2019
|
Grupo
|
Inactive
|
Ouro Preto
|
Tailings
|
Negative
|
2
|
02/20/2019
|
Pontal
|
Inactive
|
Itabira
|
Tailings
|
Negative
|
1
|
03/31/2019
|
Sul Superior
|
Inactive
|
Barão de Cocais
|
Tailings
|
Negative
|
3
|
03/22/2019
|
Vargem Grande
|
Inactive
|
Nova Lima
|
Tailings
|
Negative
|
1
|
06/04/2019
|
Xingu
|
Inactive
|
Mariana
|
Tailings
|
Negative
|
2
|
09/29/2020
|
Structures with downstream raising method
Iron Ore
Structure |
Operational Status |
Municipality |
Purpose |
DCE |
Emergency Level |
Emergency level date |
---|---|---|---|---|---|---|
5 - Mutuca
|
Active
|
Nova Lima
|
Tailings
|
Negative
|
1
|
07/29/2020
|
Maravilhas II
|
Inactive
|
Itabirito
|
Tailings
|
Negative
|
1
|
04/01/2019
|
Peneirinha
|
Inactive
|
Nova Lima
|
Tailings
|
Negative
|
1
|
04/01/2020
|
Structures with sigle step, center line or unknown raising method
Iron Ore |
Operational Status |
Municipality |
Purpose |
DCE |
Emergency Level |
Emergency level date |
|
---|---|---|---|---|---|---|---|
6
|
Inactive
|
Nova Lima
|
Sediments
|
Negative
|
1
|
06/09/2020
|
|
7A
|
Inactive
|
Nova Lima
|
Sediments
|
Negative
|
1
|
06/09/2020
|
|
B
|
Inactive
|
|
Sediments
|
Negative
|
1
|
04/01/2019
|
|
Dicão Leste
|
Active
|
Mariana
|
Sediments
|
Positive
|
1
|
09/30/2022
|
|
Dique de Pedra
|
Inactive
|
Ouro Preto
|
Tailings
|
Negative
|
2
|
02/22/2022
|
|
Norte Laranjeiras
|
Inactive
|
Barão de Cocais
|
Tailings
|
Negative
|
1
|
11/30/2021
|
|
PDE 3
|
Active
|
São Gonçalo do Rio de Baixo
|
Sediments
|
Negative
|
1
|
09/01/2021
|
List of structures at emergency level
Structures with upstream raising method
- Business unit: Iron ore
- Operational Status: Inactive
- Municipality: Nova Lima
- Purpose: Tailings
- DCE: Negative
- Emergency Level: 2
- Emergency level date: 12/02/2022
- Business unit: Iron ore
- Operational Status: Inactive
- Municipality: Mariana
- Purpose: Tailings
- DCE: Negative
- Emergency Level: 1
- Emergency level date: 04/01/2019
- Business unit: Iron ore
- Operational Status: Inactive
- Municipality: Ouro Preto
- Purpose: Tailings
- DCE: Negative
- Emergency Level: 1
- Emergency level date: 05/18/2021
- Business unit: Iron ore
- Operational Status: Inactive
- Municipality: Ouro Preto
- Purpose: Tailings
- DCE: Negative
- Emergency Level: 2
- Emergency level date: 10/08/2020
- Business unit: Iron ore
- Operational Status: Inactive
- Municipality: Ouro Preto
- Purpose: Tailings
- DCE: Negative
- Emergency Level: 2
- Emergency level date: 02/20/2019
- Business unit: Iron ore
- Operational Status: Inactive
- Municipality: Ouro Preto
- Purpose: Tailings
- DCE: Negative
- Emergency Level: 3
- Emergency level date: 03/27/2019
- Business unit: Iron ore
- Operational Status: Inactive
- Municipality: Ouro Preto
- Purpose: Tailings
- DCE: Negative
- Emergency Level: 2
- Emergency level date: 02/20/2019
Operational Status: Inactive
Municipality: Itabira
Purpose: Tailings
DCE: Negative
Emergency Level: 1
Emergency level date: 03/31/2019
- Business unit: Iron ore
- Operational Status: Inactive
- Municipality: Barão de Cocais
- Purpose: Tailings
- DCE: Negative
- Emergency Level: 3
- Emergency level date: 03/22/2019
- Business unit: Iron ore
- Operational Status: Inactive
- Municipality: Nova Lima
- Purpose: Tailings
- DCE: Negative
- Emergency Level: 1
- Emergency level date: 06/04/2019
- Business unit: Iron ore
- Operational Status: Inactive
- Municipality: Mariana
- Purpose: Tailings
- DCE: Negative
- Emergency Level: 2
- Emergency level date: 09/29/2020
Structures with downstream raising method
- Business unit: Iron ore
- Operational Status: Active
- Municipality: Nova Lima
- Purpose: Tailings
- DCE: Negative
- Emergency Level: 1
- Emergency level date: 07/29/2020
- Business unit: Iron ore
- Operational Status: Inactive
- Municipality: Itabirito
- Purpose: Tailings
- DCE: Negative
- Emergency Level: 1
- Emergency level date: 04/01/2019
- Business unit: Iron ore
- Operational Status: Inactive
- Municipality: Nova Lima
- Purpose: Tailings
- DCE: Negative
- Emergency Level: 1
- Emergency level date: 04/01/2020
Structures with sigle step, center line or unknown raising method
- Business unit: Iron ore
- Operational Status: Inactive
- Municipality: Nova Lima
- Purpose: Sediments
- DCE: Negative
- Emergency Level: 1
- Emergency level date: 06/09/2020
- Business unit: Iron ore
- Operational Status: Inactive
- Municipality: Nova Lima
- Purpose: Sediments
- DCE: Negative
- Emergency Level: 1
- Emergency level date: 06/09/2020
- Business unit: Iron ore
- Operational Status: Inactive
- Municipality: Nova Lima
- Purpose: Sediments
- DCE: Negative
- Emergency Level: 1
- Emergency level date: 04/01/2019
- Business unit: Iron ore
- Operational Status: Active
- Municipality: Mariana
- Purpose: Sediments
- DCE: Positive
- Emergency Level: 1
- Emergency level date: 09/30/2022
- Business unit: Iron ore
- Operational Status: Inactive
- Municipality: Ouro Preto
- Purpose: Tailings
- DCE: Negative
- Emergency Level: 2
- Emergency level date: 02/22/2022
- Business unit: Iron ore
- Operational Status: Inactive
- Municipality: Barão de Cocais
- Purpose: Tailings
- DCE: Negative
- Emergency Level: 1
- Emergency level date: 11/30/2021
- Business unit: Iron ore
- Operational Status: Active
- Municipality: São Gonçalo do Rio de Baixo
- Purpose: Sediments
- DCE: Negative
- Emergency Level: 1
- Emergency level date: 09/01/2021
Additional document:
Measures for emergency level structures
For the 13 structures with active level 1 emergency protocols, Vale has intensified actions for monitoring and signaling instability, in addition to carrying out studies, actions and complementary works to improve safety, as appropriate.
The 8 structures with active levels 2 and 3 emergency protocols had their respective Self-Rescue Zones¹ evacuated on a preventive basis, with the removal and relocation of families residing downstream from the structures (when applicable). In these cases, Vale adopts measures to strengthen stability and safety conditions, such as keeping the reservoirs dry, reducing water supply, and implementing by-pass channels.
Vale also maintains containment structures downstream of dams in critical conditions to prevent tailings from reaching the Secondary Safety Zone² of the municipalities in an extreme hypothetical scenario of rupture.
- In 2020, two containment structures were completed downstream the Sul Superior dams, in Barão de Cocais, and B3/B4 in Nova Lima (MG).
- In 2021, Vale completed the containment structure downstream the Forquilhas I, II, III, IV and Grupo dams, in Ouro Preto (MG).
- In 2022, Vale will complete the construction of one containment structure downstream the Pontal tailings and storage facilities, in Itabira (MG), related to the Dikes Minervino e Cordão Nova Vista.
- We are currently working on defining the solutions to implement two other downstream containment structure in Minas Gerais.
- Use of remotely operated equipment to remove tailings in critical TSFs.
Note : Self-Rescue Zones: Region where there is not enough time for the competent authorities to intervene in emergency situations. For its delimitation, a distance that corresponds to a time of arrival of the flood wave equal to thirty minutes or 10 km must be adopted. ² Secondary Safety Zones: Region contained in the Flood Map and which cannot be defined as ZAS. ³ ECJ = Upstream Tailing Storage Facility (TSF).
Emergency Preparedness and Response Plan (EPRP) for Mining Dams
Part of the Dam Safety Plan (PSB), EPRP is a technical document filed with city halls and Civil Defenses (municipal, state, and federal) and which defines immediate actions in case of emergency.
Objectives:
- Avoid or minimize loss of lives, social, economic and environmental impacts;
- Identify and classify situations and/or events that may jeopardize the integrity of the dam's structure;
- Establish emergency actions;
- Inform the flow of communication with the various agents involved.
|
EPRPs for Vale’s structures are submitted to the City Halls, Civil Defenses and the Minas Gerais State environmental bodies.
|
---|---|
Content of EPRP
Community engagement:
So that residents near the dams know how to react in emergency situations.
- Conducting simulations with communities;
- Partnership with the Civil Defense;
- Siren and alert systems;
- Open channel with the community for questions and clarifications about the EPRP.
|
EntrepreneurPrivate or governmental agent who operates the dam for own or collective benefit. |
---|---|
|
Technician responsibleIn charge of the project's professional duties: dam construction, operation, maintenance, or monitoring. |
|
CoordinatorAgent appointed by the entrepreneur to coordinate the EPRP, committed to being available to act promptly in the emergency situations of the dam. |
|
Security TeamGroup formed by professionals from the entrepreneur's own staff or by professionals contracted specifically for this purpose. |
|
External agentsPublic authorities responsible for supervising and managing dam safety. They act in case of emergency. |
|
Geotechnical Monitoring CenterTeam of the entrepreneur which continuously monitors the dam and performs the actions previously established for emergency situations. |
Used to classify the surrounding populations in case of emergencies.
|
Self-Rescue Zone (ZAS)Region where there is not enough time for the competent authorities to intervene in emergency situations. For its delimitation, a distance that corresponds to a time of arrival of the flood wave equal to thirty minutes or 10 km must be adopted. |
---|---|
|
Secondary Safety Zone (ZSS)Region contained in the Flood Map and which cannot be defined as ZAS. |
Expected Actions Flow - EPRP:
Brumadinho (MG)
In the episode at the Córrego do Feijão mine dam, in Brumadinho (MG), shortly after the event were created:- Immediate Response Group
Vale appointed one of its executives to lead the group and consolidate all emergency actions, of any nature, related to those affected by the dam breach.
On the occasion, the executive moved permanently to Belo Horizonte, in order to intensify the agility and efficiency of the actions.
- Humanitarian Aid Committee
With a team of social workers and psychologists, the committee provided assistance to those affected - which included accommodation, food, water and medicines for those affected and their families.
Initiatives in dam management
Since the dam rupture in Brumadinho, the assessments carried out by Vale have been intensified in order to support the implementation of preventive and corrective actions in all structures.
Safety and Operational Excellence Office reporting to the CEO;
Risk management composed of 3 lines of defense;
Creation of the Independent Special Advisory Committee on Dam Safety (CIAESB)¹, which reports directly to the Board of Directors;
Formation of a specific Risk Committee for geotechnical risks;
Additional strengthening to increase the safety factor of the dams;
Implementation of the Geotechnical Monitoring Center (CMG);
Restructuring of its mining dam and tailings management system.
1.
Safety and Operational Excellence Office reporting to the CEO; |
---|
2.
Risk management composed of 3 lines of defense; |
3.
Creation of the Independent Special Advisory Committee on Dam Safety (CIAESB)¹, which reports directly to the Board of Directors; |
4.
Formation of a specific Risk Committee for geotechnical risks; |
5.
Additional strengthening to increase the safety factor of the dams; |
6.
Implementation of the Geotechnical Monitoring Center (CMG); |
7.
Restructuring of its mining dam and tailings management system. |
Safety, health, and operational excellence Area reporting to the CEO |
---|
- Department led by an Executive Director who defines technical parameters;
- Support the use of standard risk and asset management models by the operational area;
- Focus on standards and procedures;
- Independent and transparent audit;
- Office dedicated to Geotechnics, focusing on the adoption of best practices.
- Responsible for the management and safety in operations;
- Comply with operational excellence guidelines;
- Asset risk management reports;
- Ensure technical expertise within the operational teams;
- Mandatory VPS (Vale Production System).
|
Business areas and functional units
|
|
---|---|---|
|
|
Routine, Performance and Risk Management System (RPR)
Vale's RPR is intended to cover all aspects relevant to the safety of a dam or tailings deposit.In this system, the following management processes are monitored:
- routine applied to the structure, through operational discipline;
- performance of the geotechnical asset, made possible by continuous and formal monitoring by the Engineer of Record;
- risks, through the identification of failure modes and their critical controls, insertion and monitoring via the business risk management platform.
Risk management of tailings dams
The governance and the updating of dam defense lines increase the flow of data within the company, allowing information related to risks and safety to be constantly reviewed and reach senior management.Strong governance and oversight for TSF¹ management supported by tailored executive compensation
Executive compensation
- 35-60% of short-term variable compensation tied to Health & Safety, Operational Risk and VPS targets
- The Safety and Operational Excellence Office has no target tied to production or financial metrics
Note : ¹ TSF stands for Tailings Storage Facility, with criteria agreed by the International Council on Mining and Metals’ Tailings Advisory Group in response to the Church of England information request, which may differ from the Brazilian National Mining Agency criteria. ² A requirement by the Global Standard Industry on Tailings Management.
Technincal
- Basic geotechnical guidelines;
- Operational discipline;
- Standards for minimum activities and routines;
- Elaboration of 25 normative standards;
- Elaboration of a policy for dam safety;
- Integration of geotechnical risks with the BRM;
- Project governance;
- Minimum requirements.
Method
- Implementation of a model based on the Routine, Performance and Risk Management System (RPR);
- Introduction of the Engineer of Record (EoR) and continuous monitoring of the structures;
- Application of HIRA’ ¹for dams;
- Maintenance Control Planning (PCM);
- Implementation of the Floor Management Development System (FMDS);
- Strategy unfolding;
- Governance.
Leadership
- Review of the organizational structure;
- Defined roles and responsibilities;
- Elaboration of RACI matrix (tool to visualize responsibilities) and review aspects of human resources;
- Behavioral transformation and enpowerment.
Indicators
Note : ¹ HIRA stands for Hazard Identification and Risk Assessment methodology. ² TSF stands for Tailings Storage Facility. ³ Includes Vale’s own facilities and excludes non-operated joint ventures. ⁴ Considering the maximum number of structures at emergency level in 2020.
The system follows the Three Lines of Defense:
First Line of Defense - Formed by the risk owners and process executors of the business, project, administrative and support areas of the company. They are directly responsible for the identification, assessment, monitoring and management of risk events in an integrated manner.
Second Line of Defense -Corresponds to the areas of occupational safety, risk management, internal controls, standardization, legal compliance and specialized areas - such as operational excellence and asset management -, supervising and supporting the work of the first line of defense.
Third Line of Defense - Composed of areas with total independence from management: Internal Audit and the Ombudsman unit. Both carry out assessments and inspections, taking into account their respective areas of operation. The result of this process is an exempt validation that includes the effectiveness of risk management, internal controls and compliance.
Note: ¹TSFs = Tailings Storage Facility
Global Industry Standard on Tailings Management
Vale is focused on the evolution of its Tailings & Dams Management System ("TDMS") for the Ferrous, Coal and Base Metals businesses. During 2019 and 2020, Vale worked closely with the International Council on Mining and Metals (ICMM) and participated actively in the Global Industry Standard on Tailings Management ("GISTM") – an effort whose purpose is to improve safety through all phases of the tailings storage facilities lifecycle.
As of 5 August 2020, Vale and all ICMM members are committed to implement the GISTM. All tailings facilities operated by Vale with “Extreme” or “Very high” potential consequences will be in conformance with the GISTM by 5 August 2023. All other tailings facilities operated by Vale not in a state of safe closure will be in conformance with the GISTM by 5 August 2025.
Vale’s Board of Directors approved, in October 2020, a new Policy for Dam Safety and Geotechnical Mining Structure, which counts with the GISTM as one of its references. Among other guidelines, the policy enforces that all components of Vale’s TDMS are designed with continuous improvement elements, using and applying the best available technology and best practices according to international institutions, including the ICMM.
The company has been working on the evolution of its TDMS prior to the GISTM and Vale will comply with the Global Industry Standard for Tailings Management:
Note: ¹ GISTM stands for Global Industry Standard on Tailings Management. ² GISTM public disclosure in March/2022. ³ Tailings Storage Facility with criteria agreed by the International Council on Mining and Metals’ Tailings Advisory Group in response to the Church of England information request, which may differ from Brazilian National Mining Agency criteria.
Concrete steps towards GISTM implementation
Non-exhaustive examples
Affected communities
- Grievance Global Standard released on October 30, 2020;
- Human Rights Global Policy and Global Standard Procedure for engagement with Indigenous People and Traditional Communities;
- Brazilian legislation requires FPIC;
- All process that requires EPRP review has an Indigenous and Quilombola component.
Integrated knowledge base
- The EPRP¹ registers the project-affected people (socio-economic and environmental);
- The most at-risk groups are also identified;
- Probabilistic seismicity hazards and climate change assessments being performed;
- TSF break studies under review, following best practices.
Design, construc-tion, operation & monitoring
- Consequence of failure classification being reviewed in accordance with GISTM;
- Addressing brittle failure modes with conservative design criteria (implementation of backup dams for the critical upstream TSF);
- Design Basis Report prepared by EoR’s;
- HIRA to assess risks and critical controls, geotechnical monitoring centers with TARPS.
Management and governance
- Policies, systems and accountabilities completely reviewed;
- ITRB and EoR appointed;
- Multi levels of review implemented;
- Geotechnical knowledge portal implemented;
- Organizational culture with VPS enforcement;
- Ombudsman channel with whistleblower protection.
Emergency response and long-term recovery
- EPRP¹ publicly disclosed;
- Engagement with public sector agencies in post-failure response strategies;
- Brumadinho reparation enabling participation of the affected people in the restoration and recovery works and ongoing monitoring activities.
Public disclosure and access to information
- GISTM implementation commitment disclosed at the ESG Portal;
- ESG Portal under frequent review to accommodate all the TSF and information requested;
- Monthly EoR reports publicly disclosed.
Affected communities
- Grievance Global Standard released on October 30, 2020;
- Human Rights Global Policy and Global Standard Procedure for engagement with Indigenous People and Traditional Communities;
- Brazilian legislation requires FPIC;
- All process that requires EPRP review has an Indigenous and Quilombola component.
Integrated knowledge base
- The EPRP¹ registers the project-affected people (socio-economic and environmental);
- The most at-risk groups are also identified;
- Probabilistic seismicity hazards and climate change assessments being performed;
- TSF break studies under review, following best practices.
Design, construc-tion, operation & monitoring
- Consequence of failure classification being reviewed in accordance with GISTM;
- Addressing brittle failure modes with conservative design criteria (implementation of backup dams for the critical upstream TSF);
- Design Basis Report prepared by EoR’s;
- HIRA to assess risks and critical controls, geotechnical monitoring centers with TARPS.
Management and governance
- Policies, systems and accountabilities completely reviewed;
- ITRB and EoR appointed;
- Multi levels of review implemented;
- Geotechnical knowledge portal implemented;
- Organizational culture with VPS enforcement;
- Ombudsman channel with whistleblower protection.
Emergency response and long-term recovery
- EPRP¹ publicly disclosed;
- Engagement with public sector agencies in post-failure response strategies;
- Brumadinho reparation enabling participation of the affected people in the restoration and recovery works and ongoing monitoring activities.
Public disclosure and access to information
- GISTM implementation commitment disclosed at the ESG Portal;
- ESG Portal under frequent review to accommodate all the TSF and information requested;
- Monthly EoR reports publicly disclosed.
Note: ¹ Emergency Action Plans for Mining Dams
Improvements and initiatives to reduce the use of dams
Vale plans to significantly reduce the use of dams and will invest in alternatives which allow wet processing operations to be replaced by safer and more sustainable processes.
In 2022, Vale reached an approximate 79% share of dry processing production compared to 40% in 2014.
Vale expects to have only approximately 15% of production based on tailings disposal in dams build in a single step or raised by center line or downstream method once:
- Reach 360 Mtpy in capacity and
- Complete the implementation of other related projects, including the production increase in Northern System, the conversion of Plant 1 in Serra Norte to dry processing, the Capanema project start-up, and the implementation of tailings filtration plants and dry concentration facilities.
Viable Solutions
Dry processing
- In Pará, about 80% of production is already dry-processing based;
- The main plant in Carajás (Pará) is in process of converting to natural moisture. Out of the plant's 17 processing lines, 11 are already dry. The remaining 6 wet processing lines will be converted by 2023;
- Processing plants in Curionópolis and Canaã dos Carajás (both in Pará) also do not use water to treat the ore;
- In Minas Gerais, it started the operation of the Itabira Complex (Cauê and Conceição) and Brucutu filtration plants, the second and third of four plants under construction in this state.
Iron ore production by method Mt
- Investment of around US$2,223 million between 2019 and 2027 in some of our sites, including Vargem Grande Complex, Itabira Complex and Brucutu, to be operated with tailings filtration systems and dry stacking tailings disposal.
- Target of investing in the construction, in Minas Gerais, of an industrial plant for magnetic concentration with a production capacity of 1.5 million tons per year - the world’s first industrial-scale dry magnetic fines concentration plant;
- The Brazilian technology is known as Fines Dry Magnetic Separation - FDMS, exclusive and developed by New Steel; and
- Project start-up expected for 2024 in the Vargem Grande complex.