

Our nickel mining and processing activities generate some waste. In accordance with good mining practices or good mining practices, we are committed to comprehensive and sustainable environmental management.

Fotógrafo: xxxx
Hazardous and Toxic Waste Management
We have a Hazardous and Toxic Waste Reduction and Utilization Policy. Our commitment to reduce the generation of hazardous and toxic waste or B3 by 50 tons/year and utilize B3 waste by 1,000 tons/year is realized through:
-
Use Kidney Lube and Modular Screening Station to reduce the generation of B3 waste by using hydraulic lubricating oil, rags, batteries, and oil filters.
-
Purchase using Iso Tank to reduce the generation of B3 waste using used drums.
-
Utilization of used oil for HSFO fuel substitution.
The company also has a Non-Hazardous and Non-Toxic Waste Reduction and Utilization Policy. Our commitment is to reduce the generation of non-B3 waste from domestic waste by 300 tons/year and utilize non-B3 waste by 4,100,000 tons/year through:
-
Using ECOTERAKO green aggregate from nickel slag as the material of choice for mine road construction.
-
Road material recycling uses road stabilizer equipment to conserve road materials.
-
Using chipping stone material from the waste reject station as a substitute for top layer crushed stone (LPA) material on logistics roads.


